IESO

Wholesale design: locational day-ahead and real-time energy markets with co-optimized real-time operating reserve, contracted ancillary services, and an annual seasonal capacity auction.

Coverage
Ontario, Canada
Nominal frequency
60 Hz
Operator
Independent Electricity System Operator

Energy trades in two layers

Layer Scheduling Settlement
Day-Ahead Market Hourly schedules with the renewed-market calculation and settlement framework Financially binding day-ahead locational prices
Real-Time Energy and Operating Reserve Markets (mandatory) Five-minute schedules and prices Real-time locational energy prices and uniform clearing price for each operating-reserve class, subject to market rules

Seven ancillary services

A missing line means the source does not state that value — never that the value is zero.

Scroll the table sideways for the rest of the columns →

7 ancillary-service products in IESO, grouped into 5 families. Each row runs left to right through one product's life: how it activates, how quickly it has to respond, how long it has to keep delivering, and how it is bought.
Service How it activates Response Sustained delivery Procurement
Regulation
Regulation Service Response type Pre-contingency continuous Trigger Continuous symmetric scheduled range around the resource operating point Dispatched by Automatic control signal Through Multi-year or bilateral contract Contracted 169.3 MW Typically scheduled 100 MW Pricing design Contract-specific
Full record for Regulation Service — document bound, page for these figures not recorded
What it is for

Match total generation and load moment to moment and correct frequency variations.

What the source does not state

The source states a contracted volume. It does not state a response time or how long delivery has to be sustained.

Sources
Contingency reserve
10-Minute Non-Synchronized Reserve 10NS Response type Post-contingency Trigger Dispatchable capability available within ten minutes; higher-quality synchronized reserve may satisfy this requirement through the reserve hierarchy Dispatched by IESO dispatch instruction Expected within 10 min Minimum obligation At least 1 h Through Real-time, five-minute Pricing design Five-minute class market-clearing price; energy payment if activated
Full record for 10-Minute Non-Synchronized Reserve — document bound, page for these figures not recorded
What it is for

Provide qualified non-synchronized standby energy or demand reduction after an unexpected system event.

Checkpoint recap

Expected within 10 min · Minimum sustained 1 h

What the source does not state

The source states the response deadline and a minimum delivery period. It does not state a maximum duration, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
10-Minute Synchronized Reserve 10S Response type Post-contingency Trigger Synchronized dispatchable capability; the overall OR requirement covers the largest contingency plus half of the second-largest contingency Dispatched by IESO dispatch instruction Expected within 10 min Minimum obligation At least 1 h Through Real-time, five-minute Pricing design Five-minute class market-clearing price; energy payment if activated
Full record for 10-Minute Synchronized Reserve — document bound, page for these figures not recorded
What it is for

Provide synchronized standby energy or demand reduction after an unexpected system event.

Checkpoint recap

Expected within 10 min · Minimum sustained 1 h

What the source does not state

The source states the response deadline and a minimum delivery period. It does not state a maximum duration, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
30-Minute Reserve 30R Response type Post-contingency Trigger Dispatchable capability available within thirty minutes; ten-minute reserve classes can also satisfy the thirty-minute requirement through the product hierarchy Dispatched by IESO dispatch instruction Expected within 30 min Minimum obligation At least 1 h Through Real-time, five-minute Pricing design Five-minute class market-clearing price; energy payment if activated
Full record for 30-Minute Reserve — document bound, page for these figures not recorded
What it is for

Provide additional non-synchronized standby energy or demand reduction within thirty minutes.

Checkpoint recap

Expected within 30 min · Minimum sustained 1 h

What the source does not state

The source states the response deadline and a minimum delivery period. It does not state a maximum duration, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Operating reserve
Reliability Must-Run Service RMR Response type Preventive location-specific Trigger Facility- and local-reliability-specific Dispatched by Contract terms and IESO instruction Through Contractual, when needed Pricing design Contract-specific
Full record for Reliability Must-Run Service — document bound, page for these figures not recorded
What it is for

Require location-specific energy or operating-reserve offers when needed to maintain grid reliability.

What the source does not state

It does not state a response time or how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Reactive power & voltage
Reactive Support and Voltage Control Service RSVC Response type Continuous or directed Trigger Prevailing system conditions and facility-specific reactive capability Dispatched by Automatic voltage control and IESO instruction Through Contractual Pricing design Contract-specific
Full record for Reactive Support and Voltage Control Service — document bound, page for these figures not recorded
What it is for

Maintain acceptable localized reactive-power and voltage levels on the IESO-controlled grid.

What the source does not state

It does not state a response time or how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Black start & restoration
Certified Black Start Facility Service Also called Certified Black Start Response type Restoration Trigger Facility-specific certification and restoration plan Dispatched by IESO restoration instruction Through Contractual Pricing design Contract-specific
Full record for Certified Black Start Facility Service — document bound, page for these figures not recorded
What it is for

Restart generation without an external power source and support restoration after a blackout.

What the source does not state

It does not state a response time or how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources

Every value above comes from the official sources listed in that product's full record. Most products cite more than one, and the published sources do not say which of them states each individual value, so the binding is to the product's record rather than to a single document.

IESO has a central capacity market

IESO Capacity Auction

The auction is the short-term balancing component of Ontario's broader resource-adequacy framework. Existing, non-committed demand response, generation, storage, and qualified imports may participate.

Unit of obligation
MW of cleared capacity obligation with availability requirements during specified business-day windows
Auction held in 2025
Yes () — Dated from the opening of the bidding window.

How a battery earns money in Ontario's IESO market

Ontario's renewed market went live on 1 May 2025, with locational marginal prices and the province's first day-ahead market. The IESO calls the period since then the interim period for storage: batteries take part under a two-resource model until its Enabling Resources Program delivers an enhanced storage model. In this period a battery can sell energy and operating reserve and, unless it is under contract to the IESO or otherwise committed, can offer capacity in the annual capacity auction. Dollar figures are Canadian dollars.

Two resources, one battery

Under the two-resource model, the IESO registers a storage facility as a generation resource and a load resource at the same connection point. Its tools do not model state of charge, so the participant manages it through its own dispatch data, for example with a Maximum Daily Energy Limit on the injecting resource and by withdrawing offers it could not follow. A facility needs more than 1 MW of injection and withdrawal capability, and it must register as dispatchable to sell real-time energy or operating reserve or to enter the capacity auction. A facility under 10 MW that only wants to trade energy can register as self-scheduling instead.

For energy, day-ahead participation comes first; reserve need not be offered day-ahead to be offered in real time. A dispatchable battery must establish its Availability Declaration Envelope in the day-ahead market for every hour in which it wants to inject or withdraw in real time. Day-ahead schedules settle at day-ahead prices, and the five-minute real-time market settles deviations from them. The IESO limits storage to 100 MW per minute when following five-minute energy dispatch, and its telemetry must include state of charge, site-controller status, ramp rate and set point.

Two settlement rules reduce a battery's charges. Under Ontario Regulation 429/04, the electricity a Class B storage facility stores and returns to the grid is exempt from Class B Global Adjustment charges once the participant files a self-declaration. Since 1 April 2026, an Ontario Energy Board decision (EB-2022-0325) exempts transmission-connected storage from transmission charges while it is scheduled for operating reserve, provides regulation or reactive support, follows a real-time IESO energy dispatch, or responds to an IESO reliability directive. The exemption covers the energy it withdraws to charge, not station service, and a facility with a connection cost recovery agreement that was paying transmission charges before 1 April 2026 can either keep paying them until that agreement's economic evaluation period ends or make a one-time capital true-up payment.

Operating reserve and the duration-of-service test

The IESO runs three operating reserve markets: 10-minute synchronized, 10-minute non-synchronized and 30-minute. A battery may offer reserve on its generation resource, its load resource or both. On the generation side, the reserve must be backed by an energy offer of at least the same MW, the battery must be able to sustain it for an hour, and it cannot bid to charge in that hour or the next. On the load side, the battery needs an energy bid of at least the same MW and must be able to hold zero consumption for an hour.

The battery must also have enough duration of service at the close of the mandatory window, ten minutes before the dispatch hour (stored energy for reserve on its generation resource, room left to charge for reserve on its load resource); if it does not, the participant must cut or withdraw its reserve offers. In the IESO's own example, a 200 MW / 800 MWh battery at 50% state of charge could meet its energy and reserve schedules; below 48% it would have had to cut its offers.

Duration-of-service test for a battery offering operating reserve (IESO Electricity Storage Operating Guide, May 2026)
Reserve offered onAvailable energy needed at mandatory-window closeMade up of
Generation resource130 minutes10 min to the start of the hour + up to 60 min before a late activation + 60 min of sustained delivery
Load resource70 minutes10 min to the start of the hour + up to 60 min before a late activation

Worked example: capacity auction revenue

Only a non-committed battery can enter the capacity auction: one that is not rate-regulated, not under contract to the IESO or the Ontario Electricity Finance Corporation, and not committed to a capacity export. Its installed capacity (ICAP) is the lesser of the temperature-sensitive power it can sustain for one hour and its temperature-adjusted energy rating divided by four hours. The IESO then applies an availability de-rating factor of 1 − EFORd, where EFORd is the equivalent forced outage rate on demand, set at 5% for storage.

A cleared battery must be available on business days during the availability window, hour ending 13 to 21 in summer and 17 to 21 in winter, and a capacity test can require it to deliver its cleared ICAP for four consecutive hours. Non-performance charges reduce the payment. The 2025 auction, with results published on 4 December 2025, cleared at C$645.24/MW-business day for summer 2026 (1 May to 31 October) and C$725.31/MW-business day for winter 2026-27 (1 November to 30 April).

Illustrative only. Take a 50 MW battery with 200 MWh of temperature-adjusted energy, assume it clears its full unforced capacity, 50 MW of ICAP less the 5% storage de-rating in Market Manual 12 Table 3-2, or 47.5 MW, and use 125 business days per obligation period, the count the IESO's own auction deposit formula uses. The IESO quotes these prices per MW per business day in its Capacity Auction Enhancements presentation of 29 January 2026, so each business day of the obligation period pays the clearing price.

For comparison, the IESO's LT1 procurement, announced in May 2024, offered contracts to 10 battery facilities totalling 1,784 MW of storage, each able to deliver for at least four consecutive hours, at a weighted average of C$672.32/MW-business day, with contracts ending in 2048. A battery holding that contract is committed and cannot also sell into the auction.

Illustrative: capacity auction payments for a 50 MW / 200 MWh battery, 2025 auction prices (C$)
StepFormulaResult
ICAPmin(50 MW, 200 MWh ÷ 4 h)50 MW
Same battery with 100 MWhmin(50 MW, 100 MWh ÷ 4 h)25 MW
Unforced capacity50 MW × (1 − 0.05)47.5 MW
Summer 202647.5 MW × C$645.24 × 125 business daysC$3,831,112.50
Winter 2026-2747.5 MW × C$725.31 × 125 business daysC$4,306,528.13
Commitment periodSummer + winterC$8,137,640.63, about C$163 per kW of ICAP

What changed recently

Storage contract prices fell before the market redesign arrived. The LT1 storage price of C$672.32/MW-business day, announced on 9 May 2024, was 24% below the C$881.09 of the expedited E-LT1 round in May 2023. The renewed market followed on 1 May 2025. The capacity auction results of 4 December 2025 acquired 1,833 MW for summer 2026 and 1,125 MW for winter 2026-27.

The next change is the enhanced storage model. The IESO's May 2026 storage guide says the first phase will model a battery as one bi-directional resource with a continuous offer curve across charging and discharging, and will model and estimate state of charge in the IESO's own tools. Most batteries now on the two-resource model will move to it; the IESO will decide which stay.

Reviewed by Sergey Syrvachev on 12 October 2026.

Sources for these notes

  1. IESO, The Electricity Storage Operating Guide, v0.1 (May 2026) (read 2026-10-12)
  2. Ontario Energy Board, Decision and Rate Order EB-2022-0325, Transmission Charge Exemption and Gross Load Billing Threshold for Electricity Storage Facilities (31 March 2026) (read 2026-10-12)
  3. IESO, Market Manual 12, Part 12.0: Capacity Auctions, Issue 6.0 (3 December 2025) (read 2026-10-12)
  4. IESO, Capacity Auction Post-Auction Report for the 2026 commitment period (4 December 2025) (read 2026-10-12)
  5. IESO news, IESO Secures Resources via 2025 Capacity Auction (4 December 2025) (read 2026-10-12)
  6. IESO, Capacity Auction Enhancements, engagement presentation, slide 9: 2025 Capacity Auction Results (29 January 2026) (read 2026-10-12)
  7. IESO, Introduction to the Capacity Auction, section 7.10.1 Availability Payment (24 August 2022) (read 2026-10-12)
  8. IESO, Resource Adequacy Update (9 May 2024) (read 2026-10-12)

Common questions about IESO

Where does energy trade in IESO?
Energy in IESO trades in two layers: Day-Ahead Market and Real-Time Energy and Operating Reserve Markets. Participation in Real-Time Energy and Operating Reserve Markets is mandatory. Scheduling and settlement, where the cited sources give them, are in the table above.
What ancillary services can a battery sell in IESO?
Seven ancillary services are listed for IESO: Regulation Service; 10-Minute Non-Synchronized Reserve; 10-Minute Synchronized Reserve; 30-Minute Reserve; Reliability Must-Run Service; Reactive Support and Voltage Control Service; and Certified Black Start Facility Service. Response timing, direction and eligibility for each are in the table above; a product's full record lists the official sources behind it.
Does IESO have a capacity mechanism?
Yes — IESO Capacity Auction is a central capacity market.
Who operates IESO?
Independent Electricity System Operator operates IESO, covering Ontario, Canada.
Was a qualifying capacity event held in IESO in 2025?
Yes. IESO Capacity Auction: a qualifying 2025 event is recorded (2025-11-26). Dated from the opening of the bidding window.
How is energy traded, priced and settled in IESO?
Locational day-ahead and real-time energy markets with co-optimized real-time operating reserve, contracted ancillary services, and an annual seasonal capacity auction.

Official sources

Capacity-mechanism explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0, rendered here with wording edited for readability). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.

All electricity markets