Ontario's renewed market went live on 1 May 2025, with locational marginal prices and the province's first day-ahead market. The IESO calls the period since then the interim period for storage: batteries take part under a two-resource model until its Enabling Resources Program delivers an enhanced storage model. In this period a battery can sell energy and operating reserve and, unless it is under contract to the IESO or otherwise committed, can offer capacity in the annual capacity auction. Dollar figures are Canadian dollars.
Two resources, one battery
Under the two-resource model, the IESO registers a storage facility as a generation resource and a load resource at the same connection point. Its tools do not model state of charge, so the participant manages it through its own dispatch data, for example with a Maximum Daily Energy Limit on the injecting resource and by withdrawing offers it could not follow. A facility needs more than 1 MW of injection and withdrawal capability, and it must register as dispatchable to sell real-time energy or operating reserve or to enter the capacity auction. A facility under 10 MW that only wants to trade energy can register as self-scheduling instead.
For energy, day-ahead participation comes first; reserve need not be offered day-ahead to be offered in real time. A dispatchable battery must establish its Availability Declaration Envelope in the day-ahead market for every hour in which it wants to inject or withdraw in real time. Day-ahead schedules settle at day-ahead prices, and the five-minute real-time market settles deviations from them. The IESO limits storage to 100 MW per minute when following five-minute energy dispatch, and its telemetry must include state of charge, site-controller status, ramp rate and set point.
Two settlement rules reduce a battery's charges. Under Ontario Regulation 429/04, the electricity a Class B storage facility stores and returns to the grid is exempt from Class B Global Adjustment charges once the participant files a self-declaration. Since 1 April 2026, an Ontario Energy Board decision (EB-2022-0325) exempts transmission-connected storage from transmission charges while it is scheduled for operating reserve, provides regulation or reactive support, follows a real-time IESO energy dispatch, or responds to an IESO reliability directive. The exemption covers the energy it withdraws to charge, not station service, and a facility with a connection cost recovery agreement that was paying transmission charges before 1 April 2026 can either keep paying them until that agreement's economic evaluation period ends or make a one-time capital true-up payment.
Operating reserve and the duration-of-service test
The IESO runs three operating reserve markets: 10-minute synchronized, 10-minute non-synchronized and 30-minute. A battery may offer reserve on its generation resource, its load resource or both. On the generation side, the reserve must be backed by an energy offer of at least the same MW, the battery must be able to sustain it for an hour, and it cannot bid to charge in that hour or the next. On the load side, the battery needs an energy bid of at least the same MW and must be able to hold zero consumption for an hour.
The battery must also have enough duration of service at the close of the mandatory window, ten minutes before the dispatch hour (stored energy for reserve on its generation resource, room left to charge for reserve on its load resource); if it does not, the participant must cut or withdraw its reserve offers. In the IESO's own example, a 200 MW / 800 MWh battery at 50% state of charge could meet its energy and reserve schedules; below 48% it would have had to cut its offers.
Duration-of-service test for a battery offering operating reserve (IESO Electricity Storage Operating Guide, May 2026) | Reserve offered on | Available energy needed at mandatory-window close | Made up of |
| Generation resource | 130 minutes | 10 min to the start of the hour + up to 60 min before a late activation + 60 min of sustained delivery |
| Load resource | 70 minutes | 10 min to the start of the hour + up to 60 min before a late activation |
Worked example: capacity auction revenue
Only a non-committed battery can enter the capacity auction: one that is not rate-regulated, not under contract to the IESO or the Ontario Electricity Finance Corporation, and not committed to a capacity export. Its installed capacity (ICAP) is the lesser of the temperature-sensitive power it can sustain for one hour and its temperature-adjusted energy rating divided by four hours. The IESO then applies an availability de-rating factor of 1 − EFORd, where EFORd is the equivalent forced outage rate on demand, set at 5% for storage.
A cleared battery must be available on business days during the availability window, hour ending 13 to 21 in summer and 17 to 21 in winter, and a capacity test can require it to deliver its cleared ICAP for four consecutive hours. Non-performance charges reduce the payment. The 2025 auction, with results published on 4 December 2025, cleared at C$645.24/MW-business day for summer 2026 (1 May to 31 October) and C$725.31/MW-business day for winter 2026-27 (1 November to 30 April).
Illustrative only. Take a 50 MW battery with 200 MWh of temperature-adjusted energy, assume it clears its full unforced capacity, 50 MW of ICAP less the 5% storage de-rating in Market Manual 12 Table 3-2, or 47.5 MW, and use 125 business days per obligation period, the count the IESO's own auction deposit formula uses. The IESO quotes these prices per MW per business day in its Capacity Auction Enhancements presentation of 29 January 2026, so each business day of the obligation period pays the clearing price.
For comparison, the IESO's LT1 procurement, announced in May 2024, offered contracts to 10 battery facilities totalling 1,784 MW of storage, each able to deliver for at least four consecutive hours, at a weighted average of C$672.32/MW-business day, with contracts ending in 2048. A battery holding that contract is committed and cannot also sell into the auction.
Illustrative: capacity auction payments for a 50 MW / 200 MWh battery, 2025 auction prices (C$) | Step | Formula | Result |
| ICAP | min(50 MW, 200 MWh ÷ 4 h) | 50 MW |
| Same battery with 100 MWh | min(50 MW, 100 MWh ÷ 4 h) | 25 MW |
| Unforced capacity | 50 MW × (1 − 0.05) | 47.5 MW |
| Summer 2026 | 47.5 MW × C$645.24 × 125 business days | C$3,831,112.50 |
| Winter 2026-27 | 47.5 MW × C$725.31 × 125 business days | C$4,306,528.13 |
| Commitment period | Summer + winter | C$8,137,640.63, about C$163 per kW of ICAP |
What changed recently
Storage contract prices fell before the market redesign arrived. The LT1 storage price of C$672.32/MW-business day, announced on 9 May 2024, was 24% below the C$881.09 of the expedited E-LT1 round in May 2023. The renewed market followed on 1 May 2025. The capacity auction results of 4 December 2025 acquired 1,833 MW for summer 2026 and 1,125 MW for winter 2026-27.
The next change is the enhanced storage model. The IESO's May 2026 storage guide says the first phase will model a battery as one bi-directional resource with a continuous offer curve across charging and discharging, and will model and estimate state of charge in the IESO's own tools. Most batteries now on the two-resource model will move to it; the IESO will decide which stay.
Reviewed by Sergey Syrvachev on 12 October 2026.