PJM

Mid-Atlantic and portions of the Midwest and South, United States.

Wholesale design: nodal energy and ancillary-services markets with a centralized Reliability Pricing Model capacity construct.

Operator
PJM Interconnection
Nominal frequency
60 Hz
Where energy trades

Where does energy trade in PJM?

Energy in PJM trades in 2 layers: Day-Ahead Energy Market and Real-Time Energy Market. Participation in Real-Time Energy Market is mandatory. Scheduling and settlement, where the official sources state them, are in the table below.

Layer Scheduling Settlement
Day-Ahead Energy Market hourly day-ahead locational marginal pricing and co-optimized reserve pricing
Real-Time Energy Market (mandatory) five-minute pricing and dispatch real-time locational marginal pricing and reserve market-clearing prices
What a battery can sell

What ancillary services can a battery sell in PJM?

PJM has 6 ancillary-service products, across 5 families — regulation, frequency containment, automatic frequency restoration, reactive power & voltage and black start & restoration: Black Start Service, Non-Synchronized Reserve, Reactive Supply and Voltage Control, Regulation, Secondary Reserve, Synchronized Reserve. Response timing, direction and eligibility for each are in the cards below, as the official sources state them.

Facts below are stated as the official sources state them. A missing line means the source does not state that value — never that the value is zero.

Regulation

  • Regulation

    Correct area-control error and help maintain interconnection frequency through automatic control.

    Activation
    PJM regulation signal
    Expected within
    5 minutes
    Trigger / range
    symmetric regulation assignment around a base point; a resource must be able to achieve its full bid capability within five minutes
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    regulation capability and performance compensation

    Manual 12 effective 2025-10-01 describes the current Phase 1 single-signal implementation.

Frequency containment

  • Non-Synchronized Reserve

    Provide offline or non-synchronized primary reserve for contingencies.

    Activation
    PJM reserve-event instruction
    Expected within
    10 minutes
    Trigger / range
    qualified capability able to start, synchronize, and reach the reserve output within ten minutes
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    reserve market-clearing price plus applicable performance settlement
  • Synchronized Reserve

    Provide online primary reserve for contingencies.

    Activation
    automatic response and/or PJM reserve-event instruction
    Expected within
    10 minutes
    Trigger / range
    synchronized capability available within ten minutes
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    reserve market-clearing price plus applicable performance settlement

Automatic frequency restoration

  • Secondary Reserve

    Provide additional thirty-minute reserve after or in anticipation of system contingencies.

    Activation
    PJM instruction
    Expected within
    30 minutes
    Trigger / range
    online or offline capability available after ten minutes and no later than thirty minutes; it qualifies for the 30-Minute Reserve requirement but not Primary Reserve
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    30-Minute Reserve market-clearing price

Reactive power & voltage

  • Reactive Supply and Voltage Control

    Supply or absorb reactive power and maintain transmission voltage schedules.

    Activation
    automatic voltage regulator and PJM instruction
    Trigger / range
    facility-specific reactive capability and voltage schedule
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    tariff-based revenue requirement and lost-opportunity-cost provisions, as applicable

Black start & restoration

  • Black Start Service

    Start without external station power and energize portions of the grid during restoration.

    Activation
    PJM restoration instruction
    Trigger / range
    system restoration plan
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    tariff-defined cost recovery
Getting paid to exist

Does PJM have a capacity mechanism?

Yes — Reliability Pricing Model is a central capacity market.

Reliability Pricing Model

Locational capacity auctions procure residual capacity after fixed-resource-requirement and self-supply positions; resources assume Capacity Performance obligations during the delivery year.

Unit of obligation
MW UCAP capacity performance commitment
Auction held in 2025
Yes () — Dated from the publication of the auction results.
Where this comes from

Official sources

Market explainer

Capacity-mechanism explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Questions

Common questions about PJM

Who operates PJM?
PJM Interconnection operates PJM, covering Mid-Atlantic and portions of the Midwest and South, United States.
Was a qualifying capacity event held in PJM in 2025?
Yes. Reliability Pricing Model: a qualifying 2025 event is recorded (2025-03-11). Dated from the publication of the auction results.
How is energy traded, priced and settled in PJM?
PJM: nodal energy and ancillary-services markets with a centralized Reliability Pricing Model capacity construct.