PJM

Mid-Atlantic and portions of the Midwest and South, United States.

Wholesale design: nodal energy and ancillary-services markets with a centralized Reliability Pricing Model capacity construct.

Operator
PJM Interconnection
Nominal frequency
60 Hz
Where energy trades

Where does energy trade in PJM?

Energy in PJM trades in 2 layers: Day-Ahead Energy Market and Real-Time Energy Market. Participation in Real-Time Energy Market is mandatory. Scheduling and settlement, where the cited sources give them, are in the table below.

Layer Scheduling Settlement
Day-Ahead Energy Market hourly day-ahead locational marginal pricing and co-optimized reserve pricing
Real-Time Energy Market (mandatory) five-minute pricing and dispatch real-time locational marginal pricing and reserve market-clearing prices
What a battery can sell

What ancillary services can a battery sell in PJM?

PJM has 6 ancillary-service products, across 5 families — regulation, frequency containment, automatic frequency restoration, reactive power & voltage and black start & restoration: Black Start Service, Non-Synchronized Reserve, Reactive Supply and Voltage Control, Regulation, Secondary Reserve, Synchronized Reserve. Response timing, direction and eligibility for each are in the table below; a product's full record lists the official sources behind it.

Every value below comes from the official sources listed in that product's full record. Most products cite more than one, and the published sources do not say which of them states each individual value, so the binding is to the product's record rather than to a single document. A missing line means the source does not state that value — never that the value is zero.

Scroll the table sideways for the rest of the columns →

6 ancillary-service products in PJM, grouped into 5 families. Each row runs left to right through one product's life: how it activates, how quickly it has to respond, how long it has to keep delivering, and how it is bought.
Service How it activates Response Sustained delivery Procurement
Regulation
Regulation Response type pre-contingency continuous Trigger symmetric regulation assignment around a base point; a resource must be able to achieve its full bid capability within five minutes Dispatched by PJM regulation signal Expected within 5 min Through hour-ahead and real-time assignment Pricing design regulation capability and performance compensation
Full record for Regulation — document bound, page for these figures not recorded
What it is for

Correct area-control error and help maintain interconnection frequency through automatic control.

Notes from the source

Manual 12 effective 2025-10-01 describes the current Phase 1 single-signal implementation.

Checkpoint recap

Expected within 5 min

What the source does not state

The source states the response deadline. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Frequency containment
Non-Synchronized Reserve Response type post-contingency Trigger qualified capability able to start, synchronize, and reach the reserve output within ten minutes Dispatched by PJM reserve-event instruction Expected within 10 min Through day-ahead; real-time Pricing design reserve market-clearing price plus applicable performance settlement
Full record for Non-Synchronized Reserve — document bound, page for these figures not recorded
What it is for

Provide offline or non-synchronized primary reserve for contingencies.

Checkpoint recap

Expected within 10 min

What the source does not state

The source states the response deadline. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Synchronized Reserve Response type post-contingency Trigger synchronized capability available within ten minutes Dispatched by automatic response and/or PJM reserve-event instruction Expected within 10 min Through day-ahead; real-time Pricing design reserve market-clearing price plus applicable performance settlement
Full record for Synchronized Reserve — document bound, page for these figures not recorded
What it is for

Provide online primary reserve for contingencies.

Checkpoint recap

Expected within 10 min

What the source does not state

The source states the response deadline. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Automatic frequency restoration
Secondary Reserve Response type post-contingency Trigger online or offline capability available after ten minutes and no later than thirty minutes; it qualifies for the 30-Minute Reserve requirement but not Primary Reserve Dispatched by PJM instruction Expected within 30 min Through day-ahead; real-time Pricing design 30-Minute Reserve market-clearing price
Full record for Secondary Reserve — document bound, page for these figures not recorded
What it is for

Provide additional thirty-minute reserve after or in anticipation of system contingencies.

Checkpoint recap

Expected within 30 min

What the source does not state

The source states the response deadline. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Reactive power & voltage
Reactive Supply and Voltage Control Reactive Services Response type continuous or directed Trigger facility-specific reactive capability and voltage schedule Dispatched by automatic voltage regulator and PJM instruction Through tariff-based Pricing design tariff-based revenue requirement and lost-opportunity-cost provisions, as applicable
Full record for Reactive Supply and Voltage Control — document bound, page for these figures not recorded
What it is for

Supply or absorb reactive power and maintain transmission voltage schedules.

What the source does not state

It does not state a response time or how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Black start & restoration
Black Start Service Black Start Response type restoration Trigger system restoration plan Dispatched by PJM restoration instruction Through cost-based service commitment Pricing design tariff-defined cost recovery
Full record for Black Start Service — document bound, page for these figures not recorded
What it is for

Start without external station power and energize portions of the grid during restoration.

What the source does not state

It does not state a response time or how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Getting paid to exist

Does PJM have a capacity mechanism?

Yes — Reliability Pricing Model is a central capacity market.

Reliability Pricing Model

Locational capacity auctions procure residual capacity after fixed-resource-requirement and self-supply positions; resources assume Capacity Performance obligations during the delivery year.

Unit of obligation
MW UCAP capacity performance commitment
Auction held in 2025
Yes () — Dated from the publication of the auction results.
Where this comes from

Official sources

Service specification

Capacity-mechanism explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0, rendered here with wording edited for readability). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Questions

Common questions about PJM

Who operates PJM?
PJM Interconnection operates PJM, covering Mid-Atlantic and portions of the Midwest and South, United States.
Was a qualifying capacity event held in PJM in 2025?
Yes. Reliability Pricing Model: a qualifying 2025 event is recorded (2025-03-11). Dated from the publication of the auction results.
How is energy traded, priced and settled in PJM?
PJM: nodal energy and ancillary-services markets with a centralized Reliability Pricing Model capacity construct.
Keep exploring

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.

All electricity markets