Colombia (CREG 060/2019, red de 500 kV) ride-through requirements

High-voltage ride-through for Colombia. Every breakpoint below is read from the code itself, and carries the clause it came from — so you can check it, not just cite it.

1Envelope
HVRTEvents
Transmission Connection level
at 500 kV (STN) Applicability boundary
HVRT

What is the high-voltage ride-through envelope for Colombia (CREG 060/2019, red de 500 kV)?

The plant must ride through for any voltage that stays on or below this envelope. The envelope holds 1.2 pu from t = 0 to 2 s; then 1.05 pu from 2 s onward — the last band the envelope defines, with no stated end time.

Every breakpoint is stated in the clause cited below.

Applies to Wind + PV plants connected at 500 kV (STN)

Colombia (CREG 060/2019, red de 500 kV) — high-voltage ride-through envelopeColombia (CREG 060/2019, red de 500 kV) high-voltage ride-through envelope. The plant must ride through for any voltage that stays on or below the line; above it, the envelope no longer applies. Logarithmic time axis from 0.1 s to 10 s; linear voltage axis in per-unit. The first band applies from the instant of the event (t = 0). The envelope holds 1.2 pu from t = 0 to 2 s; then 1.05 pu from 2 s onward — the last band the envelope defines, with no stated end time (drawn as an open dashed tail).Colombia (CREG 060/2019, red de 500 kV) — high-voltage ride-through envelopenominal 1.00 pu0.11100.20.5250.951.001.051.101.151.201.25Time from event start (s, log scale) · first band applies from t = 0Voltage (pu)1.05 puMUST RIDE THROUGHmust ride through on or below the lineopen — no stated end time
High-voltage ride-through envelope for Colombia (CREG 060/2019, red de 500 kV). Time runs on a logarithmic axis. Scroll the chart sideways for the rest of the time axis →
High-voltage ride-through breakpoints for Colombia (CREG 060/2019, red de 500 kV)
From To Voltage Between the points
0 2 s 1.2 pu Held flat
2 s no stated end 1.05 pu Held flat
The clause this came from

Resolución CREG 060 de 2019, Artículo 14 — numeral 5.7 lit. c) del Código de Operación; figura 'Característica de LVRT y HVRT para plantas eólicas y solares fotovoltaicas con conexión a nivel de 500 kV' (official graphic obj_3.gif).

Scope

Who does Colombia (CREG 060/2019, red de 500 kV) bind, and since when?

Wind + PV plants connected at 500 kV (STN). No date of effect is published here — grid codes are reissued, so check the current issue before relying on it.

These figures are a reading aid, not legal advice. Grid codes are reissued: verify against the current edition before you design to them.

Digitised operating parameters beyond ride-through — droop, reactive capability, operating ranges — are published for 36 of the 66 codes in this atlas, not yet for Colombia (CREG 060/2019, red de 500 kV). That is a gap on this site, not a statement that Colombia (CREG 060/2019, red de 500 kV) sets none — the atlas hub marks the codes that carry them.

Curve data last checked against the code on — 66 standards, 130 envelopes, published by bess.engineer under CC BY 4.0.

Questions

Questions this page answers about Colombia (CREG 060/2019, red de 500 kV)

Does Colombia (CREG 060/2019, red de 500 kV) require ride-through, or only that the plant does not trip?
Ride-through. Every envelope on this page is a performance duty the plant must meet, not a protection-setting no-trip boundary — they are different obligations. That is what these curves are; they are not everything Colombia (CREG 060/2019, red de 500 kV) contains. The requirement sentence under each chart says which side of the curve is the compliant one.
Are the numbers on this page taken from Colombia (CREG 060/2019, red de 500 kV) itself?
Yes. Every breakpoint is read from the code, and each envelope carries the clause it came from, quoted in full under its chart — so you can check the figure against the standard rather than cite it from this page.
Which events are charted for Colombia (CREG 060/2019, red de 500 kV)?
Colombia (CREG 060/2019, red de 500 kV) is charted here with 1 envelope — high-voltage ride-through (HVRT). No low-voltage or frequency envelope is charted here — check Colombia (CREG 060/2019, red de 500 kV) itself before concluding it sets none.
Related

Ride-through, in context.

An envelope is a compliance boundary; understanding why it exists is a different question. The ride-through and grid-forming entries cover the engineering, and the Engineering Foundations course builds it from the physics up.