Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) ride-through requirements

Low-voltage ride-through, High-voltage ride-through for Argentina. Every breakpoint below is read from the code itself, and where a point was taken off a published figure rather than stated in the clause, the section under that chart says so — a curve with no recorded source class.

2Envelopes
LVRT · HVRTEvents
LVRT

What is the low-voltage ride-through envelope for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)?

The plant must ride through for any voltage that stays on or above this envelope. The envelope holds 0 pu from t = 0 to 120 ms; then 0.5 pu from 120 ms to 900 ms; then 0.7 pu from 900 ms to 1 s; then 0.9 pu from 1 s to 20 min; then 0.95 pu from 20 min onward — the last band the envelope defines, with no stated end time.

Check these points against the clause quoted below before relying on them.

Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) — low-voltage ride-through envelopeArgentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) low-voltage ride-through envelope. The plant must ride through for any voltage that stays on or above the line; below it, the envelope no longer applies. Logarithmic time axis from 0.01 s to 5000 s; linear voltage axis in per-unit. The first band applies from the instant of the event (t = 0). The envelope holds 0 pu from t = 0 to 120 ms; then 0.5 pu from 120 ms to 900 ms; then 0.7 pu from 900 ms to 1 s; then 0.9 pu from 1 s to 20 min; then 0.95 pu from 20 min onward — the last band the envelope defines, with no stated end time (drawn as an open dashed tail). Check these points against the clause below.Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) — low-voltage ride-through envelopeCheck these points against the clause belownominal 1.00 pu0.010.111010010000.000.200.400.600.801.001.20Time from event start (s, log scale) · first band applies from t = 0Voltage (pu)0.95 puMUST RIDE THROUGHmust ride through on or above the lineopen — no stated end time
Low-voltage ride-through envelope for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1). Time runs on a logarithmic axis. Scroll the chart sideways for the rest of the time axis →
Low-voltage ride-through breakpoints for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)
From To Voltage Between the points
0 120 ms 0 pu Held flat
120 ms 900 ms 0.5 pu Held flat
900 ms 1 s 0.7 pu Held flat
1 s 20 min 0.9 pu Held flat
20 min no stated end 0.95 pu Held flat
The clause this came from

CAMMESA, LOS PROCEDIMIENTOS – P.T.4, ANEXO I, numeral 9.8.3 'Tolerancia a huecos de tensión (LVRT)' items 1)–6) + Fig. Ai.1 'curva límite tensión-tiempo (LVRT – HVRT), Ejemplo para Parques ERNC vinculados a nodos de 500 kV' (p.48). Versión 03-Oct-2023.

HVRT

What is the high-voltage ride-through envelope for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)?

The plant must ride through for any voltage that stays on or below this envelope. The envelope holds 1.2 pu from t = 0 to 120 ms; then 1.1 pu from 120 ms to 20 min; then 1.05 pu from 20 min onward — the last band the envelope defines, with no stated end time.

Check these points against the clause quoted below before relying on them.

Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) — high-voltage ride-through envelopeArgentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) high-voltage ride-through envelope. The plant must ride through for any voltage that stays on or below the line; above it, the envelope no longer applies. Logarithmic time axis from 0.01 s to 5000 s; linear voltage axis in per-unit. The first band applies from the instant of the event (t = 0). The envelope holds 1.2 pu from t = 0 to 120 ms; then 1.1 pu from 120 ms to 20 min; then 1.05 pu from 20 min onward — the last band the envelope defines, with no stated end time (drawn as an open dashed tail). Check these points against the clause below.Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) — high-voltage ride-through envelopeCheck these points against the clause belownominal 1.00 pu0.010.111010010000.951.001.051.101.151.201.25Time from event start (s, log scale) · first band applies from t = 0Voltage (pu)1.05 puMUST RIDE THROUGHmust ride through on or below the lineopen — no stated end time
High-voltage ride-through envelope for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1). Time runs on a logarithmic axis. Scroll the chart sideways for the rest of the time axis →
High-voltage ride-through breakpoints for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)
From To Voltage Between the points
0 120 ms 1.2 pu Held flat
120 ms 20 min 1.1 pu Held flat
20 min no stated end 1.05 pu Held flat
The clause this came from

CAMMESA, LOS PROCEDIMIENTOS – P.T.4, ANEXO I, numeral 9.8.4 'Tolerancia a sobretensiones (HVRT)' items 1)–4) + Fig. Ai.1 (p.48). Versión 03-Oct-2023.

Scope

Who does Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) bind, and since when?

This code does not carry a short scope statement — read the clause quoted above for who it binds. No date of effect is published here — grid codes are reissued, so check the current issue before relying on it.

These figures are a reading aid, not legal advice. Grid codes are reissued: verify against the current edition before you design to them.

Digitised operating parameters beyond ride-through — droop, reactive capability, operating ranges — are published for 36 of the 66 codes in this atlas, not yet for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1). That is a gap on this site, not a statement that Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) sets none — the atlas hub marks the codes that carry them.

Curve data last checked against the code on — 66 standards, 130 envelopes, published by bess.engineer under CC BY 4.0.

Questions

Questions this page answers about Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)

Does Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) require ride-through, or only that the plant does not trip?
Ride-through. Every envelope on this page is a performance duty the plant must meet, not a protection-setting no-trip boundary — they are different obligations. That is what these curves are; they are not everything Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) contains. The requirement sentence under each chart says which side of the curve is the compliant one.
Are the numbers on this page taken from Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) itself?
Every breakpoint is read from the code, and where a point was taken off a published figure rather than stated in the clause, the section under that chart says so — on this page that includes a curve with no recorded source class. The clause each curve came from is quoted under it.
Which events are charted for Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)?
Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) is charted here with 2 envelopes — low-voltage ride-through, high-voltage ride-through (LVRT, HVRT). No frequency envelope is charted here — check Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1) itself before concluding it sets none.
Related

Ride-through, in context.

An envelope is a compliance boundary; understanding why it exists is a different question. The ride-through and grid-forming entries cover the engineering, and the Engineering Foundations course builds it from the physics up.