Take a visual tour of a battery energy storage system (BESS) and see how its main parts connect—from battery containers to the grid.

Welcome to Episode 1 of BESS Decoded: complex battery storage concepts explained through clear, simple visualizations.

We start with the solar “duck curve” and show how charging and discharging a battery changes the power the grid needs to supply. Then we explore the equipment around an illustrated BESS site:

  • Battery containers: where energy is stored
  • PCS / MV skid: power conversion and the move to medium voltage
  • Energy stations: repeating the same building block across the site
  • MV switchgear, the main step-up transformer and the HV switchyard
  • The point of interconnection: where the plant meets the grid
  • The control building: coordinating charging and discharging
  • The reverse charging path: from the grid back to the batteries

See how the equipment works together as one complete system.

Terms in this episode

  • Battery Energy Storage System — the whole installation: cells, enclosures, PCS, transformers, controls, and protection.

  • Medium, low, and high voltage — the levels a BESS plant steps through from inverter to the transmission grid.

  • The plant-level step-up between the MV collection bus and the interconnection voltage — one engineered unit, sized in MVA at the high side, printed with a rating per cooling stage, and often the longest-lead item on the project.

  • Where the plant meets the grid. Performance and compliance are measured here, not at the inverter.

Go deeper

Build your knowledge with structured courses and practical learning resources.

Grid-Scale Battery Energy Storage (BESS): Complete Guide

The complete foundation — from cell chemistry to grid revenue. Batteries, enclosures, PCS, controls, safety, project finance, and how BESS actually makes money.

Learn it in the Grid-Scale BESS course