Sistema Eléctrico Nacional (Chile) has 12 ancillary-service products, across 8 families — frequency containment, fast frequency response, automatic frequency restoration, manual frequency restoration, reactive power & voltage, black start & restoration, emergency control and demand response: Control de Contingencias, Control Primario de Frecuencia por Sobrefrecuencia, Control Primario de Frecuencia por Subfrecuencia, Control Rápido de Frecuencia por Sobrefrecuencia, Control Rápido de Frecuencia por Subfrecuencia, Control Secundario de Frecuencia por Sobrefrecuencia, Control Secundario de Frecuencia por Subfrecuencia, Control Terciario de Frecuencia por Sobrefrecuencia, and 4 more. Response timing, direction and eligibility for each are in the cards below, as the official sources state them.
Facts below are stated as the official sources state them. A missing line means the
source does not state that value — never that the value is zero.
Frequency containment
-
Control Primario de Frecuencia por Sobrefrecuencia CPF-
operational
Contain and correct frequency deviations, including overfrequency contingencies.
- Direction
- down
- Response starts
- within 2 s
- Full activation
- 10 s
- Sustain
- at least 5 min; Minimum delivery 5 minutes; no universal maximum stated
- Trigger / range
- Normal-operation band is 50 ±0.2 Hz; important contingencies exceed ±0.2 Hz. Resource-specific deadbands and settings apply.
- Eligibility
- Verified synchronous generation, wind, solar and storage resources.
- Typical procurement
- 24–85 MW (2025)
- Pricing
- Wear-cost offers subject to caps; opportunity costs and incremental costs settled ex post
-
Control Primario de Frecuencia por Subfrecuencia CPF+
operational
Contain and correct frequency deviations, including underfrequency contingencies.
- Direction
- up
- Response starts
- within 2 s
- Full activation
- 10 s
- Sustain
- at least 5 min; Minimum delivery 5 minutes; no universal maximum stated
- Trigger / range
- Normal-operation band is 50 ±0.2 Hz; important contingencies exceed ±0.2 Hz. Some active-energy compensators use ±0.3 Hz activation, but this is resource-specific.
- Eligibility
- Verified synchronous generation, wind, solar, storage and other qualifying installations.
- Typical procurement
- 22–331 MW (2025)
- Pricing
- Cost offers subject to caps plus ex-post opportunity and incremental costs
Fast frequency response
-
Control Rápido de Frecuencia por Sobrefrecuencia CRF-
defined not required 2026
Rapidly respond to overfrequency deviations and contingencies.
- Direction
- down
- Full activation
- 1 s
- Sustain
- at least 5 min; Minimum delivery 5 minutes; no universal maximum stated
- Trigger / range
- Event-triggered; the definition does not prescribe one universal threshold for every resource.
- Eligibility
- Verified generation, storage and other capable facilities under the technical standard.
- Typical procurement
- No technical need identified for 2026
- Pricing
- Not procured in 2026
-
Control Rápido de Frecuencia por Subfrecuencia CRF+
defined not required 2026
Rapidly respond to underfrequency deviations and contingencies.
- Direction
- up
- Full activation
- 1 s
- Sustain
- at least 5 min; Minimum delivery 5 minutes; no universal maximum stated
- Trigger / range
- Event-triggered; the definition does not prescribe one universal threshold for every resource.
- Eligibility
- Verified generation, storage and other capable facilities under the technical standard.
- Typical procurement
- No technical need identified for 2026
- Pricing
- Not procured in 2026
Automatic frequency restoration
-
Control Secundario de Frecuencia por Sobrefrecuencia CSF-
operational
Automatically restore system frequency to nominal and manage intrahour net-demand variations through AGC.
- Direction
- down
- Full activation
- 5 min
- Sustain
- at least 15 min; Minimum delivery 15 minutes; no universal maximum stated
- Trigger / range
- AGC centralized control; requirement covers intrahour variation, minimum AGC reserve and five-minute ramps.
- Eligibility
- AGC-qualified synchronous generation, wind, solar and storage.
- Typical procurement
- 120–322 MW (2025)
- Pricing
- Wear-cost offer plus ex-post opportunity and incremental costs
-
Control Secundario de Frecuencia por Subfrecuencia CSF+
operational
Automatically restore system frequency to nominal and manage intrahour net-demand variations through AGC.
- Direction
- up
- Full activation
- 5 min
- Sustain
- at least 15 min; Minimum delivery 15 minutes; no universal maximum stated
- Trigger / range
- AGC centralized control; requirement covers intrahour variation, minimum AGC reserve and five-minute ramps.
- Eligibility
- AGC-qualified synchronous generation, wind, solar and storage.
- Typical procurement
- 132–323 MW (2025)
- Pricing
- Wear-cost offer plus ex-post opportunity and incremental costs
Manual frequency restoration
-
Control Terciario de Frecuencia por Sobrefrecuencia CTF-
operational
Restore secondary-frequency-control reserves or add reserve when faster categories are insufficient.
- Direction
- down
- Response starts
- within 5 min
- Full activation
- 15 min
- Sustain
- up to 1 h; Maximum delivery 1 hour
- Trigger / range
- Activated by real-time instruction from the Coordinator.
- Eligibility
- Verified generation, wind, solar, storage and eligible free customers/aggregators.
- Typical procurement
- 94–633 MW (2025)
- Pricing
- Wear-cost offer plus ex-post opportunity and incremental costs
-
Control Terciario de Frecuencia por Subfrecuencia CTF+
operational
Restore secondary-frequency-control reserves or add reserve when faster categories are insufficient.
- Direction
- up
- Response starts
- within 5 min
- Full activation
- 15 min
- Sustain
- up to 1 h; Maximum delivery 1 hour
- Trigger / range
- Activated by real-time instruction from the Coordinator.
- Eligibility
- Verified generation, wind, solar, storage and eligible free customers/aggregators.
- Typical procurement
- 76–625 MW (2025)
- Pricing
- Wear-cost offer plus ex-post opportunity and incremental costs
Black start & restoration
Demand response
-
Cargas Interrumpibles CI
defined not required 2026
Reduce free-customer demand during high-load/low-generation conditions, congestion or system emergencies.
- Direction
- up
- Full activation
- 30 min
- Sustain
- at least 2 h; Minimum delivery 2 hours; no universal maximum stated
- Trigger / range
- Activated by Coordinator instruction.
- Eligibility
- Free customers individually or through aggregators.
- Typical procurement
- Not required for 2026
- Pricing
- No 2026 procurement; tender terms would apply when required