Wholesale design: CAMMESA centrally schedules and dispatches the SADI using declared and regulated costs; the MEM includes spot transactions and supply contracts under administered remuneration rules.

Status
Operational
Coverage
Argentina
Operator
CAMMESA
Pricing granularity
Hybrid
Settlement interval
60 minutes
Nominal frequency
50 Hz

Five ancillary services

A missing line means the source does not state that value — never that the value is zero.

Scroll the table sideways for the rest of the columns →

5 ancillary-service products in the Mercado Eléctrico Mayorista (Argentina SADI), grouped into 4 families. Each row runs left to right through one product's life: how it activates, how quickly it has to respond, how long it has to keep delivering, and how it is bought.
Service How it activates Response Sustained delivery Procurement
Frequency containment
Reserva para Regulación Primaria de Frecuencia RPF Direction: symmetric operational Response type Continuous; automatic local Trigger Frequency-control settings under CAMMESA operating procedures. No deadline established Governor/control-specific; no universal value published on the cited requirement page Reported, not a current requirement 3 percent of generation (reference schedule) Source wording: 3% rotating-reserve reference CAMMESA supplies this as a possible base-analysis value; it is not recorded here as a verified current procurement requirement. Bought Hourly assignment Through Administrative assignment Pricing design Reference remuneration factor of 100% of PMSPOT on the cited CAMMESA page; the page presents it for a possible base analysis, not as a verified current tariff
Full record for Reserva para Regulación Primaria de Frecuencia — document bound, page for these figures not recorded
What it is for

Automatically contain frequency deviations using synchronized rotating reserve.

Bought in blocks of

1 h

Who can provide it

Synchronized generating units capable of primary regulation.

What the source does not state

The source states a procurement volume. It does not state a response time or how long delivery has to be sustained.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Automatic frequency restoration
Reserva para Regulación Secundaria de Frecuencia RSF Direction: symmetric operational Response type Continuous; automatic central Trigger CAMMESA secondary-control instruction. No deadline established No universal value published on the cited requirement page Reported, not a current requirement 2.1 percent of generation (reference schedule) Source wording: 2.1% rotating-reserve reference CAMMESA supplies this as a possible base-analysis value; it is not recorded here as a verified current procurement requirement. Bought Hourly assignment Through Administrative assignment Pricing design Reference remuneration factor of 50% of PMSPOT on the cited CAMMESA page; not verified as a current tariff
Full record for Reserva para Regulación Secundaria de Frecuencia — document bound, page for these figures not recorded
What it is for

Restore frequency after primary control using synchronized reserve.

Bought in blocks of

1 h

Who can provide it

Qualified synchronized generating units.

What the source does not state

The source states a procurement volume. It does not state a response time or how long delivery has to be sustained.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Contingency reserve
Reserva de 10 minutos R10min Direction: up operational Response type Post-fault; manual Trigger CAMMESA dispatch instruction. No deadline established Named ten-minute reserve; the cited page does not establish a universal full-activation deadline Reported, not a current requirement 2.1 percent of generation (reference schedule) Source wording: 2.1% rotating/offline-reserve reference CAMMESA supplies this as a possible base-analysis value; it is not recorded here as a verified current procurement requirement. Bought Hourly assignment Through Administrative assignment Pricing design Reference remuneration factor of 15% of PMSPOT on the cited CAMMESA page; not verified as a current tariff
Full record for Reserva de 10 minutos — document bound, page for these figures not recorded
What it is for

Provide contingency reserve from rotating or stopped units.

Bought in blocks of

1 h

Who can provide it

Rotating or offline resources described in CAMMESA's reference reserve schedule.

What the source does not state

The source states a procurement volume. It does not state a response time or how long delivery has to be sustained.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Reserva de 5 minutos R5min Direction: up operational Response type Post-fault; manual Trigger CAMMESA dispatch instruction. No deadline established Named five-minute reserve; the cited page does not establish a universal full-activation deadline Reported, not a current requirement 2.1 percent of generation (reference schedule) Source wording: 2.1% rotating/offline-reserve reference CAMMESA supplies this as a possible base-analysis value; it is not recorded here as a verified current procurement requirement. Bought Hourly assignment Through Administrative assignment Pricing design Reference remuneration factor of 20% of PMSPOT on the cited CAMMESA page; not verified as a current tariff
Full record for Reserva de 5 minutos — document bound, page for these figures not recorded
What it is for

Provide rapid replacement/contingency reserve from rotating or stopped units.

Bought in blocks of

1 h

Who can provide it

Rotating or offline resources described in CAMMESA's reference reserve schedule.

What the source does not state

The source states a procurement volume. It does not state a response time or how long delivery has to be sustained.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Replacement reserve
Reserva de 20 minutos R20min Direction: up operational Response type Post-fault; manual Trigger CAMMESA dispatch instruction. No deadline established Named twenty-minute reserve; the cited page does not establish a universal full-activation deadline Reported, not a current requirement 3 percent of generation (reference schedule) Source wording: 3% offline-reserve reference CAMMESA supplies this as a possible base-analysis value; it is not recorded here as a verified current procurement requirement. Bought Hourly assignment Through Administrative assignment Pricing design Reference remuneration factor of 10% of PMSPOT on the cited CAMMESA page; not verified as a current tariff
Full record for Reserva de 20 minutos — document bound, page for these figures not recorded
What it is for

Provide slower replacement reserve from offline units.

Bought in blocks of

1 h

Who can provide it

Offline resources described in CAMMESA's reference reserve schedule.

What the source does not state

The source states a procurement volume. It does not state a response time or how long delivery has to be sustained.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Every value above comes from the official sources listed in that product's full record. Most products cite more than one, and the published sources do not say which of them states each individual value, so the binding is to the product's record rather than to a single document.

The Mercado Eléctrico Mayorista (Argentina SADI) has one capacity/adequacy arrangement

Remuneración administrada de disponibilidad de potencia para generación alcanzada

Operational

Resolution SE 602/2025 provides an administered monthly availability payment for a defined set of thermal and hydro generators that have neither committed availability and energy under MEM contracts nor eligibility for the spot regime created by Resolution SE 400/2025. Payment equals each unit's average monthly actual available capacity multiplied by its regulated Precio de Potencia Garantizada. This is a scoped administered remuneration record, not evidence of an organized market-wide capacity auction.

Administrative assignment

Responsibility
Secretaría de Energía / CAMMESA
Unit of obligation
Average monthly MW of actual available capacity (Disponibilidad Real de Potencia) for generators within the rule's defined scope
Auction held in 2025
No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.

Common questions about the Mercado Eléctrico Mayorista (Argentina SADI)

What ancillary services can a battery sell in the Mercado Eléctrico Mayorista (Argentina SADI)?
Five ancillary services are listed for the Mercado Eléctrico Mayorista (Argentina SADI): Reserva para Regulación Primaria de Frecuencia, Reserva para Regulación Secundaria de Frecuencia, Reserva de 10 minutos, Reserva de 5 minutos and Reserva de 20 minutos. Response timing, direction and eligibility for each are in the table above; a product's full record lists the official sources behind it.
Does the Mercado Eléctrico Mayorista (Argentina SADI) have a capacity mechanism?
One capacity/adequacy arrangement is listed for the Mercado Eléctrico Mayorista (Argentina SADI): the Remuneración administrada de disponibilidad de potencia para generación alcanzada. The official sources do not say whether it is a central capacity market. Responsibility sits with Secretaría de Energía / CAMMESA.
Who operates the Mercado Eléctrico Mayorista (Argentina SADI)?
CAMMESA operates the Mercado Eléctrico Mayorista (Argentina SADI), covering Argentina.
Was a qualifying capacity event held in the Mercado Eléctrico Mayorista (Argentina SADI) in 2025?
No. Remuneración administrada de disponibilidad de potencia para generación alcanzada: no qualifying 2025 event is recorded. No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
How is energy traded, priced and settled in the Mercado Eléctrico Mayorista (Argentina SADI)?
CAMMESA centrally schedules and dispatches the SADI using declared and regulated costs; the MEM includes spot transactions and supply contracts under administered remuneration rules. Pricing granularity — hybrid; settlement interval — 60 minutes.

Official sources

Market explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0, rendered here with wording edited for readability). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.

All electricity markets