No operational market-wide capacity mechanism
not operational
Adequacy is currently addressed through central planning, regulated procurement and bilateral/IPP programmes. The future SAWEM design should not be represented as an already-operational capacity market.
other
- Responsibility
- Department of Electricity and Energy / NTCSA / NERSA
- Auction held in 2025
- No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.