Mercado Mayorista de Electricidad (Peru SEIN)

Peru. Status: operational.

Wholesale design: COES centrally dispatches the system on audited variable costs. The short-term market settles energy and capacity, while bilateral contracts serve regulated and free customers.

Operator
COES
Pricing granularity
nodal
Settlement interval
15 minutes
Nominal frequency
60 Hz
What a battery can sell

What ancillary services can a battery sell in Mercado Mayorista de Electricidad (Peru SEIN)?

Mercado Mayorista de Electricidad (Peru SEIN) has 5 ancillary-service products, across 5 families — frequency containment, automatic frequency restoration, contingency reserve, reactive power & voltage and black start & restoration: Arranque Autónomo / Restablecimiento, Reserva de Emergencia no Sincronizada, Reserva Rotante para Regulación Primaria de Frecuencia, Reserva Rotante para Regulación Secundaria de Frecuencia, Regulación de Tensión / Potencia Reactiva. Response timing, direction and eligibility for each are in the table below; a product's full record lists the official sources behind it.

Every value below comes from the official sources listed in that product's full record. Most products cite more than one, and the published sources do not say which of them states each individual value, so the binding is to the product's record rather than to a single document. A missing line means the source does not state that value — never that the value is zero.

Scroll the table sideways for the rest of the columns →

5 ancillary-service products in Mercado Mayorista de Electricidad (Peru SEIN), grouped into 5 families. Each row runs left to right through one product's life: how it activates, how quickly it has to respond, how long it has to keep delivering, and how it is bought.
Service How it activates Response Sustained delivery Procurement
Frequency containment
Reserva Rotante para Regulación Primaria de Frecuencia RRPF symmetric operational Response type continuous; automatic local Trigger Frequency deviation under generator governor/control settings. No deadline established Automatic response action during the first 0–10 seconds; the cited definition does not state a universal 100% delivery point As the source describes it at least 30 s; At least the following 30 seconds; longer response governed by operating procedure Varies COES study/operation-specific Bought Operational scheduling Through mandatory provision; regulated cost recovery Pricing design Short-term-market complementary-service settlement
Full record for Reserva Rotante para Regulación Primaria de Frecuencia — document bound, page for these figures not recorded
What it is for

Automatically contain frequency excursions through rotating reserve.

Who can provide it

COES-qualified synchronized generation and other resources permitted by procedure.

Checkpoint recap

Minimum sustained 30 s

What the source does not state

The source states a delivery duration in its own words and a procurement volume in its own words. It does not state a response time.

Sources
Automatic frequency restoration
Reserva Rotante para Regulación Secundaria de Frecuencia RRSF symmetric operational Response type automatic central; manual Trigger COES automatic or manual control instruction. No deadline established Procedure-specific; the official glossary confirms automatic or manual response but does not set one universal activation time As the source describes it at least 30 min; Sustainable for at least 30 minutes Varies COES study/operation-specific Bought Operational scheduling Through administrative assignment; regulated cost recovery Pricing design Short-term-market complementary-service settlement
Full record for Reserva Rotante para Regulación Secundaria de Frecuencia — document bound, page for these figures not recorded
What it is for

Restore frequency and system balance after primary response.

Who can provide it

COES-qualified units capable of secondary regulation.

Checkpoint recap

Minimum sustained 30 min

What the source does not state

The source states a delivery duration in its own words and a procurement volume in its own words. It does not state a response time.

Sources
Contingency reserve
Reserva de Emergencia no Sincronizada up operational Response type post-fault; manual Trigger Emergency dispatch instruction. No deadline established Starts and connects in less than 10 minutes; no universal full-delivery point is stated Varies COES-determined Bought Operational availability Through administrative assignment; regulated cost recovery Pricing design Complementary-service settlement
Full record for Reserva de Emergencia no Sincronizada — document bound, page for these figures not recorded
What it is for

Provide independent non-synchronized generation following emergency conditions.

Who can provide it

Independent emergency generating units meeting COES requirements.

What the source does not state

The source states a procurement volume in its own words. It does not state a response time or how long delivery has to be sustained.

Sources
Reactive power & voltage
Regulación de Tensión / Potencia Reactiva non-directional operational Response type continuous; automatic local; manual Trigger Voltage setpoints and COES instruction. Stated response Equipment-specific As the source describes it Continuous or as instructed As stated Location-specific Bought Continuous/operational Through mandatory provision; regulated cost recovery Pricing design Complementary-service settlement under MME rules
Full record for Regulación de Tensión / Potencia Reactiva — document bound, page for these figures not recorded
What it is for

Maintain system voltage using reactive capability and voltage control.

Who can provide it

Qualified generating units and reactive compensation equipment.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Black start & restoration
Arranque Autónomo / Restablecimiento operational Response type post-fault; manual; event-triggered Trigger Restoration-plan activation. Stated response Facility- and restoration-plan-specific As the source describes it Restoration-plan-specific As stated Restoration-plan-specific Bought Restoration plan Through administrative assignment; regulated cost recovery Pricing design Complementary-service treatment
Full record for Arranque Autónomo / Restablecimiento — document bound, page for these figures not recorded
What it is for

Start without external supply and support system restoration.

Who can provide it

Certified black-start resources.

Sources

The official evidence behind this row is real but incomplete, contextual or reference-only — not specific enough to state these values more firmly.

Getting paid to exist

Does Mercado Mayorista de Electricidad (Peru SEIN) have a capacity mechanism?

Mercado Mayorista de Electricidad (Peru SEIN) has 1 capacity/adequacy arrangement: Remuneración de Potencia / Potencia Firme. The official sources do not say whether it is a central capacity market. Responsibility sits with COES / Osinergmin.

Remuneración de Potencia / Potencia Firme

operational

The short-term market includes regulated capacity valuation and transfers; it is not a centralized capacity auction.

administrative assignment

Responsibility
COES / Osinergmin
Unit of obligation
MW of firm power recognized under COES procedures
Auction held in 2025
No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
Where this comes from

Official sources

Service specification

Market explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0, rendered here with wording edited for readability). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Questions

Common questions about Mercado Mayorista de Electricidad (Peru SEIN)

Who operates Mercado Mayorista de Electricidad (Peru SEIN)?
COES operates Mercado Mayorista de Electricidad (Peru SEIN), covering Peru.
Was a qualifying capacity event held in Mercado Mayorista de Electricidad (Peru SEIN) in 2025?
No. Remuneración de Potencia / Potencia Firme: no qualifying 2025 event is recorded. No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
How is energy traded, priced and settled in Mercado Mayorista de Electricidad (Peru SEIN)?
Mercado Mayorista de Electricidad (Peru SEIN): COES centrally dispatches the system on audited variable costs. The short-term market settles energy and capacity, while bilateral contracts serve regulated and free customers. Pricing granularity — nodal; settlement interval — 15 minutes.
Keep exploring

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.