What a battery can sell
What ancillary services can a battery sell in Portugal electricity market?
Portugal electricity market has 4 ancillary-service products, across 4 families — frequency containment, automatic frequency restoration, manual frequency restoration and replacement reserve: automatic Frequency Restoration Reserve, Frequency Containment Reserve, manual Frequency Restoration Reserve, Replacement Reserve. Response timing, direction and eligibility for each are in the cards below, as the official sources state them.
Facts below are stated as the official sources state them. A missing line means the
source does not state that value — never that the value is zero.
Frequency containment
-
Frequency Containment Reserve
operational
Contain frequency deviations before frequency-restoration processes take over.
- Direction
- symmetric or separate upward/downward according to synchronous area and national procurement
- Full activation
- 30 s
- Trigger / range
- continuous response to local frequency deviation; exact deadband and droop are national/synchronous-area technical parameters
- Eligibility
- prequalified generation, storage or demand resources meeting synchronous-area and national TSO requirements
- Typical procurement
- Dynamic or not publicly stated
- Pricing
- national/regional rules
Thirty seconds is the Continental Europe full-activation time, not a universal Europe-wide value.
Continental Europe requirement for a frequency deviation of at least 200 mHz; do not apply to Nordic FCR products
Automatic frequency restoration
-
automatic Frequency Restoration Reserve
operational in participating markets; rollout continued
Restore frequency and area-control error and release FCR after an imbalance.
- Direction
- separate upward and downward
- Full activation
- 5 min
- Trigger / range
- activated from TSO control-area needs rather than a single public frequency threshold
- Eligibility
- prequalified balancing service providers; aggregation rules are national
- Typical procurement
- Dynamic or not publicly stated
- Pricing
- capacity pricing is national; common merit-order activation and marginal pricing apply through PICASSO subject to implementation rules
A common balancing-energy product does not imply common national capacity procurement, qualification or settlement.
EU standard-product full activation time; before 18 December 2025 national products and transition rules still apply and have to be checked market by market
Manual frequency restoration
-
manual Frequency Restoration Reserve
operational in national markets; MARI integration continued
Restore system balance manually or by automated dispatch after faster reserves and release aFRR/FCR.
- Direction
- separate upward and downward
- Full activation
- 750 s
- Sustain
- at least 5 min
- Trigger / range
- TSO activation based on imbalance, reserve need and common merit order; not a single frequency threshold
- Eligibility
- prequalified balancing service providers; aggregation and telemetry requirements are national
- Typical procurement
- Dynamic or not publicly stated
- Pricing
- national capacity rules and common-platform energy pricing under the implementation framework
The 12.5-minute value is a standard-product maximum full-activation time; legacy national tertiary products may use different labels or timings.
maximum full activation time for the EU standard product; legacy national products may differ
Replacement reserve
-
Replacement Reserve
operational in participating national implementations; TERRE operations ended 30 December 2025 ahead of decommissioning
Replace restoration reserves and cover longer-lasting imbalances with slower resources.
- Direction
- separate upward and downward
- Full activation
- 30 min
- Sustain
- at least 15 min
- Trigger / range
- TSO activation from replacement-reserve need through national arrangements or TERRE
- Eligibility
- prequalified balancing service providers capable of the scheduled block product
- Typical procurement
- Dynamic or not publicly stated
- Pricing
- common merit-order activation through TERRE where connected
TERRE platform status changed at year-end 2025; the product should not be presented as a still-growing platform after that date.
maximum full activation time for the European RR standard product