CENACE Mexico

Mexico.

Wholesale design: Mercado Eléctrico Mayorista with day-ahead and real-time energy/ancillary-service co-optimization, an annual ex-post capacity balance, and conditional competitive reliability-acquisition mechanisms effective from April 2026.

Operator
Centro Nacional de Control de Energía
Nominal frequency
60 Hz
Where energy trades

Where does energy trade in CENACE Mexico?

Energy in CENACE Mexico trades in 2 layers: Mercado del Día en Adelanto and Mercado de Tiempo Real. Participation in Mercado de Tiempo Real is mandatory. Scheduling and settlement, where the official sources state them, are in the table below.

Layer Scheduling Settlement
Mercado del Día en Adelanto hourly day-ahead commitment and schedules local marginal energy prices and zonal ancillary-service marginal prices in the two-settlement market
Mercado de Tiempo Real (mandatory) five-minute security-constrained economic dispatch with ancillary-service assignments established on the applicable real-time scheduling cycle real-time local marginal energy prices and zonal ancillary-service marginal prices; deviations from day-ahead positions are settled in the two-settlement framework
What a battery can sell

What ancillary services can a battery sell in CENACE Mexico?

CENACE Mexico has 10 ancillary-service products, across 5 families — automatic frequency restoration, replacement reserve, reactive power & voltage, black start & restoration and emergency control: Dead-Bus Connection, Emergency Start, Island Operation, 10-Minute Non-Spinning Reserve, 10-Minute Spinning Reserve, Reactive Power / Voltage Support, Reactive Reserve / Voltage Control, Secondary Frequency Regulation Reserve, and 2 more. Response timing, direction and eligibility for each are in the cards below, as the official sources state them.

Facts below are stated as the official sources state them. A missing line means the source does not state that value — never that the value is zero.

Automatic frequency restoration

  • Secondary Frequency Regulation Reserve

    Correct frequency and scheduled interchange deviations through centralized automatic generation control.

    Activation
    Control Automático de Generación; desired-generation signals are calculated every four seconds
    Stated response
    Four seconds is the AGC execution interval, not a universal full-response time for every participating unit.
    Trigger / range
    continuous regulation around economic-dispatch base points and participation factors
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    zonal marginal reserve price; the product can also satisfy the spinning, operating, and supplemental reserve requirement hierarchy

Replacement reserve

  • 10-Minute Non-Spinning Reserve

    Provide qualified non-synchronized contingency reserve and contribute to operating and supplemental requirements.

    Activation
    CENACE dispatch instruction
    Expected within
    10 minutes
    Trigger / range
    qualified non-synchronized capability available within ten minutes
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    zonal marginal price equal to the relevant stacked scarcity dual values under the reserve hierarchy
  • 10-Minute Spinning Reserve

    Provide synchronized contingency reserve and contribute to higher-tier operating and supplemental requirements.

    Activation
    CENACE dispatch instruction and synchronized response
    Expected within
    10 minutes
    Trigger / range
    synchronized capability available within ten minutes
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    zonal marginal price equal to the relevant stacked scarcity dual values under the reserve hierarchy
  • Non-Spinning Supplemental Reserve

    Provide non-synchronized capacity for the supplemental-reserve requirement after faster reserve categories.

    Activation
    CENACE dispatch instruction
    Trigger / range
    supplemental-reserve requirement; current public short-term-market manual does not state one product name-embedded response deadline
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    same supplemental-reserve marginal price as spinning supplemental reserve
  • Spinning Supplemental Reserve

    Provide synchronized capacity for the supplemental-reserve requirement after faster reserve categories.

    Activation
    CENACE dispatch instruction
    Trigger / range
    supplemental-reserve requirement; current public short-term-market manual does not state one product name-embedded response deadline
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    same supplemental-reserve marginal price as non-spinning supplemental reserve

Reactive power & voltage

  • Reactive Power / Voltage Support

    Inject or absorb reactive power to maintain local voltage.

    Activation
    CENACE instruction and automatic voltage control
    Trigger / range
    facility- and location-specific reactive-power requirement
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    regulated tariff or applicable non-market ancillary-service compensation
  • Reactive Reserve / Voltage Control

    Keep reactive capability available to control system voltage.

    Activation
    CENACE instruction and automatic voltage control
    Trigger / range
    facility- and system-specific reactive reserve need
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    regulated tariff or applicable non-market ancillary-service compensation

Black start & restoration

  • Dead-Bus Connection

    Energize and connect to a de-energized bus as part of transmission-system restoration.

    Activation
    CENACE restoration instruction
    Trigger / range
    facility- and restoration-plan-specific
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    regulated tariff or applicable non-market ancillary-service compensation

Emergency control

  • Emergency Start

    Start generation under emergency or restoration conditions without relying on ordinary market commitment.

    Activation
    CENACE emergency or restoration instruction
    Trigger / range
    facility-specific restoration requirement
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    regulated tariff or applicable non-market ancillary-service compensation
  • Island Operation

    Operate a facility or electrical area in an islanded condition to preserve service and aid restoration.

    Activation
    CENACE instruction and protection/control schemes
    Trigger / range
    facility- and restoration-plan-specific
    Typical procurement
    Dynamic or not publicly stated
    Pricing
    regulated tariff or applicable non-market ancillary-service compensation
Getting paid to exist

Does CENACE Mexico have a capacity mechanism?

No central capacity market. CENACE Mexico has 2 capacity/adequacy arrangements — Mercado para el Balance de Potencia and Mecanismos de Adquisición por Confiabilidad — and they work differently.

Mercado para el Balance de Potencia

The MBP balances residual capacity obligations and uncommitted capacity after bilateral Electricity Hedge Contracts. It calculates zonal demand/offer curves and settlement prices but is not a forward capacity auction.

Unit of obligation
MW-year of Potencia
Auction held in 2025
No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.

Mecanismos de Adquisición por Confiabilidad

The framework was effective from 2026-04-03. CENACE had issued and reported case-specific 2026 reliability-acquisition solicitations for energy and associated products in the Peninsular-Tabasco region by the cutoff. This does not convert the annual ex-post MBP into an auction and does not establish a standing capacity market.

case-specific competitive reliability solicitation; the framework itself does not establish a recurring forward capacity-auction calendar

Auction held in 2025
No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
Where this comes from

Official sources

Rules

Market explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Questions

Common questions about CENACE Mexico

Who operates CENACE Mexico?
Centro Nacional de Control de Energía operates CENACE Mexico, covering Mexico.
Was a qualifying capacity event held in CENACE Mexico in 2025?
No. Mercado para el Balance de Potencia: no qualifying 2025 event is recorded. No capacity auction for this market was found to have been held during 2025 in the sources reviewed. Mecanismos de Adquisición por Confiabilidad: no qualifying 2025 event is recorded. No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
How is energy traded, priced and settled in CENACE Mexico?
CENACE Mexico: Mercado Eléctrico Mayorista with day-ahead and real-time energy/ancillary-service co-optimization, an annual ex-post capacity balance, and conditional competitive reliability-acquisition mechanisms effective from April 2026.
Keep exploring

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.

All electricity markets