Netherlands (TenneT) ride-through requirements

Low-voltage ride-through for the Netherlands. Every breakpoint below is read from the code itself, and carries the clause it came from — so you can check it, not just cite it.

1Envelope
LVRTEvents
Transmission Connection level
≥110 kV Applicability boundary
LVRT

What is the low-voltage ride-through envelope for Netherlands (TenneT)?

The plant must ride through for any voltage that stays on or above this envelope. The envelope holds 0 pu from t = 0 to 250 ms; then ramps linearly from 0 pu at 250 ms to 0.85 pu at 3 s; then 0.85 pu from 3 s onward — the last band the envelope defines, with no stated end time.

The clause states this boundary as a line; intermediate points are interpolated between its stated vertices.

Applies to Type D power park modules (RfG art. 16), ≥110 kV

Netherlands (TenneT) — low-voltage ride-through envelopeNetherlands (TenneT) low-voltage ride-through envelope. The plant must ride through for any voltage that stays on or above the line; below it, the envelope no longer applies. Logarithmic time axis from 0.01 s to 10 s; linear voltage axis in per-unit. The first band applies from the instant of the event (t = 0). The envelope holds 0 pu from t = 0 to 250 ms; then ramps linearly from 0 pu at 250 ms to 0.85 pu at 3 s; then 0.85 pu from 3 s onward — the last band the envelope defines, with no stated end time (drawn as an open dashed tail).Netherlands (TenneT) — low-voltage ride-through envelopenominal 1.00 pu0.010.11100.000.200.400.600.801.001.20Time from event start (s, log scale) · first band applies from t = 0Voltage (pu)0.85 puMUST RIDE THROUGHmust ride through on or above the lineopen — no stated end time
Low-voltage ride-through envelope for the Netherlands (TenneT). Time runs on a logarithmic axis, so the ramp — a straight line in real time — only looks curved here. Scroll the chart sideways for the rest of the time axis →
Low-voltage ride-through breakpoints for the Netherlands (TenneT)
From To Voltage Between the points
0 250 ms 0 pu Held flat
250 ms 3 s 0 → 0.85 pu Ramps linearly
3 s no stated end 0.85 pu Held flat
The clause this came from

Netcode elektriciteit (versie 23-12-2023), artikel implementing NLE RfG 16(3)(a)(i), lid 3: 'Uret is 0 pu; Uclear is Uret; Urec1 is Uclear; Urec2 is 0,85 pu; tclear is 0,25 s; trec1 is tclear; trec2 is trec1; trec3 is 3,0 s' (besluiten ACM/UIT/509776 en ACM/UIT/575492); type-B PPM values in artikel 3.17 lid 3. The code defines a linear recovery ramp; the vertices are read from the clause and the chart draws the segment between them.

Beyond ride-through

Operating requirements beyond the envelopes.

The envelopes above are what Netherlands (TenneT) demands during a disturbance. The rows below are the same regime’s operating and fault-response requirements — reactive capability, frequency response, continuous operating range, ramp rate, RoCoF withstand and fault-current injection — each researched from the document its own row cites, separately from the plotted corpus. Every row carries its clause and a verbatim quote, so you can check it the same way.

Supplementary operating requirements for the Netherlands (TenneT)
Requirement What the code states Clause
U-Q/Pmax envelope ±0,33 (PPM) Reactive capability Q/Pmax = 0,33 supply and 0,33 absorb at maximum capacity, voltage-dependent: supply 0,33 from 0,9 pu to 1,05 pu, linear taper 0,33→0,0 between 1,05 pu and 1,1 pu; absorb 0,33 from 0,95 pu to 1,1 pu, linear taper 0,0→0,33 between 0,9 pu and 0,95 pu (basis: maximumcapaciteit = Pmax) National determination of the U-Q/Pmax profile under RfG Art 20(2)(a) for type B power park modules. Binds storage explicitly: Artikel 2.9, derde lid, onderdeel a applies the NC RfG connection conditions and the corresponding parts of Hoofdstuk 3 to elektriciteitsopslageenheden 'van overeenkomstige toepassing' (mutatis mutandis); under 4° a storage unit ≥1 MW and <50 MW complies with the type B provisions (which include Artikel 3.17). For type C/D PPMs (storage ≥50 MW / ≥60 MW via 5°/6°) Artikel 3.24, eerste lid declares the same U-Q/Pmax profile; Artikel 3.28 modifies it for PPMs on transmission systems ≥300 kV. No charge/discharge asymmetry is stated — the profile is symmetric in Q (0,33 both directions) and the storage article adds no separate reactive rule. Artikel 3.17, eerste en tweede lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 + Artikel 2.9, derde lid, onderdeel a, onder 4°, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clauses this row cites

Artikel 3.17, eerste en tweede lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ De power park module is in staat bij zijn maximumcapaciteit en bij variërende spanning maximaal een hoeveelheid blindvermogen te leveren dat gekenschetst wordt door een verhouding van blindvermogen tot maximumcapaciteit, als bedoeld in artikel 20, tweede lid, onderdeel a, van Verordening (EU) 2016/631 (NC RfG): a. gelijk aan 0,33 bij een spanning van 0,9 pu tot 1,05 pu; en b. dat bepaald wordt door het lineaire verloop tussen respectievelijk 0,33 en 0,0 bij een spanning tussen 1,05 pu en 1,1 pu. 2 De power park module is in staat bij zijn maximumcapaciteit en bij variërende spanning maximaal een hoeveelheid blindvermogen op te nemen dat gekenschetst wordt door een verhouding van blindvermogen tot maximumcapaciteit, als bedoeld in artikel 20, tweede lid, onderdeel a, van Verordening (EU) 2016/631 (NC RfG): a. gelijk aan 0,33 bij een spanning van 0,95 pu tot 1,1 pu; en b. dat bepaald wordt door het lineaire verloop tussen respectievelijk 0,0 en 0,33 bij een spanning tussen 0,9 pu en 0,95 pu. ” Translation: “ The power park module is capable, at its maximum capacity and at varying voltage, of supplying at most an amount of reactive power that is characterised by a ratio of reactive power to maximum capacity, as referred to in Article 20(2)(a) of Regulation (EU) 2016/631 (NC RfG): a. equal to 0,33 at a voltage of 0,9 pu to 1,05 pu; and b. that is determined by the linear course between 0,33 and 0,0 respectively at a voltage between 1,05 pu and 1,1 pu. 2 The power park module is capable, at its maximum capacity and at varying voltage, of absorbing at most an amount of reactive power that is characterised by a ratio of reactive power to maximum capacity, as referred to in Article 20(2)(a) of Regulation (EU) 2016/631 (NC RfG): a. equal to 0,33 at a voltage of 0,95 pu to 1,1 pu; and b. that is determined by the linear course between 0,0 and 0,33 respectively at a voltage between 0,9 pu and 0,95 pu. ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Artikel 2.9, derde lid, onderdeel a, onder 4°, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ 4°. een elektriciteitsopslageenheid met een maximaal te leveren werkzaam vermogen groter dan of gelijk aan 1 MW en kleiner dan 50 MW voldoet aan de bepalingen die van toepassing zijn op een elektriciteitsproductie-eenheid van het type B; ” Translation: “ 4°. an electricity storage unit with a maximum deliverable active power greater than or equal to 1 MW and smaller than 50 MW complies with the provisions that apply to an electricity production unit of type B; ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Part-load P-Q/Pmax envelope (PPM) Reactive capability Below maximum capacity: Q/Pmax = 0,33 (supply and absorb) available for active power from 0,2 pu to 1 pu; for P between 0,0 and 0,2 pu the available Q/Pmax runs linearly from 0,0 to 0,33 (basis Pmax) National P-Q/Pmax profile determination under RfG Art 20(2)(a) for type B power park modules; the part-load envelope of Artikel 3.17, vijfde t/m negende lid. Binds storage ≥1 MW via Artikel 2.9, derde lid, onderdeel a (storage 1-50 MW → type B provisions under 4°; non-synchronously coupled storage → PPM articles under 2°); for type C/D PPMs Artikel 3.24, tweede lid declares the same P-Q/Pmax profile. No separate charging-mode P-Q envelope is stated for storage. Artikel 3.17, vijfde en zesde lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clause this row cites

Artikel 3.17, vijfde en zesde lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ De power park module is in staat bij een werkzaam vermogen beneden de maximumcapaciteit maximaal een hoeveelheid blindvermogen te leveren dat gekenschetst wordt door een verhouding van blindvermogen tot maximumcapaciteit als bedoeld in artikel 20, tweede lid, onderdeel a, van Verordening (EU) 2016/631 (NC RfG): a. gelijk aan 0,33 bij een werkzaam vermogen van 0,2 pu tot 1 pu; en b. dat bepaald wordt door het lineaire verloop tussen respectievelijk 0,0 en 0,33 bij een werkzaam vermogen van 0,0 pu tot 0,2 pu. 6 De power park module is in staat bij een werkzaam vermogen beneden de maximumcapaciteit maximaal een hoeveelheid blindvermogen op te nemen dat gekenschetst wordt door een verhouding van blindvermogen tot maximumcapaciteit als bedoeld in artikel 20, tweede lid, onderdeel a, van Verordening (EU) 2016/631 (NC RfG): a. gelijk aan 0,33 bij een werkzaam vermogen van 0,2 pu tot 1 pu; en b. dat bepaald wordt door het lineaire verloop tussen respectievelijk 0,0 en 0,33 bij een werkzaam vermogen van 0,0 pu tot 0,2 pu. ” Translation: “ The power park module is capable, at an active power below the maximum capacity, of supplying at most an amount of reactive power that is characterised by a ratio of reactive power to maximum capacity as referred to in Article 20(2)(a) of Regulation (EU) 2016/631 (NC RfG): a. equal to 0,33 at an active power of 0,2 pu to 1 pu; and b. that is determined by the linear course between 0,0 and 0,33 respectively at an active power of 0,0 pu to 0,2 pu. 6 The power park module is capable, at an active power below the maximum capacity, of absorbing at most an amount of reactive power that is characterised by a ratio of reactive power to maximum capacity as referred to in Article 20(2)(a) of Regulation (EU) 2016/631 (NC RfG): a. equal to 0,33 at an active power of 0,2 pu to 1 pu; and b. that is determined by the linear course between 0,0 and 0,33 respectively at an active power of 0,0 pu to 0,2 pu. ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

LFSM droop and thresholds (storage) Frequency response LFSM-U droop for electricity storage units is set at 2% (units >0,8 kW and <1 MW) and 1% (units ≥1 MW), in both storage (charging) and generation mode; LFSM-O: frequency threshold setting 50,2 Hz (adjustable 50,2–50,5 Hz inclusive), droop adjustable 4–12%, default setting 5% Artikel 2.9, derde lid, onderdeel g binds storage explicitly and by name: by way of derogation from the mutatis-mutandis chain of onderdeel a, the limited frequency sensitive mode – underfrequency droop (statiek) is fixed at 2%/1% by size class, in both opslagmodus and opwekkingsmodus. LFSM-O settings are the type A determinations of Artikel 3.11, vierde lid (RfG Art 13(2)), applying to storage ≥0,8 kW via Artikel 2.9(3)(a) under 3°-6°; the code states no storage-specific LFSM-O deviation. Measured as active-power response; for a PPM, Pref = actual generated active power at the moment the LFSM-O threshold is reached (Artikel 3.11(4)(f)). Artikel 2.9, derde lid, onderdeel g, Systeemcode elektriciteit 2026, geldend van 09-07-2026 + Artikel 3.11, vierde lid, onderdelen a t/m d, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clauses this row cites

Artikel 2.9, derde lid, onderdeel g, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ g. geldt in afwijking van onderdeel a dat voor de gelimiteerde frequentiegevoelige modus – onderfrequentie in zowel de opslag- als in de opwekkingsmodus de statiek ingesteld is op: 1°. 2% voor elektriciteitsopslageenheden groter dan 0,8 kW en kleiner dan 1 MW; en 2°. 1% voor elektriciteitsopslageenheden groter dan of gelijk aan 1 MW; en ” Translation: “ g. by way of derogation from subparagraph a, it applies that for the limited frequency sensitive mode – underfrequency, in both the storage mode and the generation mode, the droop is set at: 1°. 2% for electricity storage units greater than 0,8 kW and smaller than 1 MW; and 2°. 1% for electricity storage units greater than or equal to 1 MW; and ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Artikel 3.11, vierde lid, onderdelen a t/m d, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ De elektriciteitsproductie-eenheid is voor de gelimiteerde frequentiegevoelige modus – overfrequentie in staat om de levering van de frequentierespons te activeren, bedoeld in artikel 13, tweede lid, van Verordening (EU) 2016/631 (NC RfG), waarbij: a. de frequentiedrempelwaarde instelbaar is tussen 50,2 Hz en 50,5 Hz (inclusief); b. de instelling van de frequentiedrempelwaarde 50,2 Hz is; c. de statiek instelbaar is tussen 4% en 12%; d. de default instelling van de statiek 5% is; ” Translation: “ The electricity production unit is, for the limited frequency sensitive mode – overfrequency, capable of activating the delivery of the frequency response, referred to in Article 13(2) of Regulation (EU) 2016/631 (NC RfG), whereby: a. the frequency threshold value is adjustable between 50,2 Hz and 50,5 Hz (inclusive); b. the setting of the frequency threshold value is 50,2 Hz; c. the droop is adjustable between 4% and 12%; d. the default setting of the droop is 5%; ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

FSM parameters (type C/D) Frequency response FSM: droop adjustable 4–12%; dead band adjustable 0–500 mHz; frequency-response insensitivity 10 mHz; active-power range 1,5%–10% of maximum capacity; maximum permitted full-activation time t2 = 30 seconds National FSM determinations under RfG Art 15(2)(d) for type C units; type D units comply via Artikel 3.25, vierde lid. Binds storage via generation-scoped chain: Artikel 2.9(3)(a) under 5°/6° maps storage ≥50 MW to type C and ≥60 MW to type D provisions mutatis mutandis (a typical grid-scale BESS of 1–50 MW is type B, so the type-C parameter values here do not bind it directly — but see the scope note below: the RfG article 15 FSM duty still applies to it). Response measured as active-power frequency response; for a PPM, Pref = actual generated active power when the FSM threshold is reached (Artikel 3.22(3)(e)). Note on scope: Artikel 2.9(3)(a)2° requires every non-synchronously coupled storage unit to comply with RfG artikelen 13 t/m 16 and 20 t/m 22 — article 15 is FSM — irrespective of size class, so FSM is not switched off for a 1–50 MW BESS by its type-B classification. Artikel 3.22, derde lid, onderdelen a t/m d, Systeemcode elektriciteit 2026, geldend van 09-07-2026 + Artikel 3.22, vierde lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clauses this row cites

Artikel 3.22, derde lid, onderdelen a t/m d, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ De elektriciteitsproductie-eenheid is in staat, wanneer de frequentiegevoelige modus in bedrijf is, de frequentierespons voor het werkzaam vermogen te leveren, als bedoeld in artikel 15, tweede lid, onderdeel d, subonderdeel i, van Verordening (EU) 2016/631 (NC RfG), overeenkomstig de volgende parameters: a. het bereik van het werkzaam vermogen in verhouding tot de maximumcapaciteit: range is: 1,5%–10%; b. de ongevoeligheid van de frequentierespons is: 10 mHz; c. de dode band van de frequentierespons is instelbaar tussen 0 en 500 mHz; d. de statiek is instelbaar tussen 4% en 12%; ” Translation: “ The electricity production unit is capable, when the frequency sensitive mode is in operation, of delivering the frequency response for the active power, as referred to in Article 15(2)(d)(i) of Regulation (EU) 2016/631 (NC RfG), in accordance with the following parameters: a. the range of the active power in relation to the maximum capacity: range is: 1,5%–10%; b. the insensitivity of the frequency response is: 10 mHz; c. the dead band of the frequency response is adjustable between 0 and 500 mHz; d. the droop is adjustable between 4% and 12%; ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Artikel 3.22, vierde lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ De elektriciteitsproductie-eenheid is in staat de volledige frequentierespons te leveren, als bedoeld in artikel 15, tweede lid, onderdeel d, subonderdeel iii, en tabel 5 van Verordening (EU) 2016/631 (NC RfG), overeenkomstig de volgende parameters: a. het bereik van het werkzaam vermogen in verhouding tot de maximumcapaciteit ligt tussen de 1,5% en 10%; de waarde van het bereik wordt per elektriciteitsproductie-eenheid vastgelegd in de overeenkomst voor de levering van reservecapaciteit; b. de maximaal toegestane tijd t2 voor elektriciteitsproductie-eenheden is: 30 seconden. ” Translation: “ The electricity production unit is capable of delivering the full frequency response, as referred to in Article 15(2)(d)(iii) and Table 5 of Regulation (EU) 2016/631 (NC RfG), in accordance with the following parameters: a. the range of the active power in relation to the maximum capacity lies between 1,5% and 10%; the value of the range is laid down per electricity production unit in the agreement for the delivery of reserve capacity; b. the maximum permitted time t2 for electricity production units is: 30 seconds. ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Frequency operating bands Continuous operating range Remain connected and in operation: 47,5–48,5 Hz for 30 minutes; 48,5–49,0 Hz for 30 minutes; 49,0–51,0 Hz for unlimited time; 51,0–51,5 Hz for 30 minutes National determination of RfG Art 13(1)(a)(i) frequency bands and time periods, a type A requirement incorporated by types B/C/D via Artikelen 3.14, 3.21 and 3.25. Binds storage via Artikel 2.9(3)(a) mutatis mutandis (size classes 3°-6°); the storage article adds no deviating frequency bands. Voltage bands sit elsewhere and are not extracted here: Artikel 3.13, negende lid (units on MV or HV <110 kV: 0,85–0,90 pu for 3 minutes with active power reducible to 80% of maximum capacity), Artikel 3.22, zevende lid (type C automatic disconnection allowed only below 0,85 pu or above 1,15 pu) and Artikel 3.26, eerste lid (type D: 20 minutes for 1,118–1,15 pu on systems <300 kV and for 1,05–1,10 pu on 300–400 kV systems). Artikel 3.11, eerste lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clause this row cites

Artikel 3.11, eerste lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ De elektriciteitsproductie-eenheid is in staat om op het systeem aangesloten en in bedrijf te blijven binnen de volgende frequentiebanden en tijdsperiodes, bedoeld in artikel 13, eerste lid, onderdeel a, subonderdeel i, van Verordening (EU) 2016/631 (NC RfG): a. in de frequentieband van 47,5 Hz tot 48,5 Hz gedurende 30 minuten; b. in de frequentieband van 48,5 Hz tot 49,0 Hz gedurende 30 minuten; c. in de frequentieband van 49,0 Hz tot 51,0 Hz gedurende onbeperkte tijd; d. in de frequentieband van 51,0 Hz tot 51,5 Hz gedurende 30 minuten. ” Translation: “ The electricity production unit is capable of remaining connected to the system and in operation within the following frequency bands and time periods, referred to in Article 13(1)(a)(i) of Regulation (EU) 2016/631 (NC RfG): a. in the frequency band from 47,5 Hz to 48,5 Hz for 30 minutes; b. in the frequency band from 48,5 Hz to 49,0 Hz for 30 minutes; c. in the frequency band from 49,0 Hz to 51,0 Hz for an unlimited time; d. in the frequency band from 51,0 Hz to 51,5 Hz for 30 minutes. ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Active-power ramp-rate bounds Ramp rate Ramping determination under RfG Art 15(6)(e): the minimum of the upward and downward ramping rate of active power is 1% of maximum capacity per minute; the maximum of the ramping rate is 20% of maximum capacity per minute Type C determination (type D complies via Artikel 3.25, vierde lid). RfG Art 15(6)(e) is the basis on which the relevant system operator specifies ramping limits; the code fixes the bounds of that specification. Binds storage ≥50 MW via Artikel 2.9(3)(a) under 5°/6° (mutatis mutandis); no separate charge/discharge ramp values are stated for storage. Separately, on (re)connection the maximum active-power gradient is 20% of maximum capacity per minute (Artikel 3.11, zevende lid, onderdeel d; Artikel 3.15, negende lid, onderdeel e), applicable from type A / type B respectively. Artikel 3.22, vijftiende lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clause this row cites

Artikel 3.22, vijftiende lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ Zoals bedoeld in artikel 15, zesde lid, onderdeel e, van Verordening (EU) 2016/631 (NC RfG) is: a. het minimum van de op- en afregelsnelheid van het werkzame vermogen 1% van de maximumcapaciteit per minuut; b. het maximum van de regelsnelheid van het werkzame vermogen 20% van de maximumcapaciteit per minuut. ” Translation: “ As referred to in Article 15(6)(e) of Regulation (EU) 2016/631 (NC RfG): a. the minimum of the upward and downward ramping rate of the active power is 1% of the maximum capacity per minute; b. the maximum of the ramping rate of the active power is 20% of the maximum capacity per minute. ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

RoCoF withstand 2 Hz/s (PPM) RoCoF withstand RoCoF withstand threshold values: 2 Hz per second over a rolling 500 ms time window for a power park module; 1 Hz per second over a rolling 500 ms window for a synchronous electricity production unit (which may be set lower in consultation with the system operator) National determination of RfG Art 13(1)(b) (rate-of-change-of-frequency withstand), a type A requirement that types B/C/D incorporate via Artikelen 3.14, 3.21 and 3.25. Binds storage via Artikel 2.9(3)(a): a non-synchronously coupled storage unit (converter-based BESS) complies with the PPM articles (under 2°) and the size-class provisions (under 3°-6°), so the 2 Hz/s PPM threshold applies; a synchronously coupled storage unit takes the 1 Hz/s value. Measuring window stated in the rule itself: voortschrijdend tijdsvenster (rolling window) of 500 milliseconds. Artikel 3.11, tweede lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clause this row cites

Artikel 3.11, tweede lid, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ Voor de frequentiegradiënt van elektriciteitsproductie-eenheden, bedoeld in artikel 13, eerste lid, onderdeel b, van Verordening (EU) 2016/631 (NC RfG) gelden de volgende drempelwaarden: a. 1 Hertz per seconde gedurende een voortschrijdend tijdsvenster van 500 milliseconden in het geval er sprake is van een synchrone elektriciteitsproductie-eenheid; b. In afwijking van onderdeel a. kan in overleg met de systeembeheerder de drempelwaarde van de frequentiegradiënt voor een synchrone elektriciteitsproductie-eenheid lager worden vastgesteld; c. 2 Hertz per seconde gedurende een voortschrijdend tijdsvenster van 500 milliseconden in het geval er sprake is van een power park module. ” Translation: “ For the frequency gradient (rate of change of frequency) of electricity production units, referred to in Article 13(1)(b) of Regulation (EU) 2016/631 (NC RfG), the following threshold values apply: a. 1 Hertz per second during a rolling time window of 500 milliseconds in the case of a synchronous electricity production unit; b. By way of derogation from subparagraph a. the threshold value of the frequency gradient for a synchronous electricity production unit can be set lower in consultation with the system operator; c. 2 Hertz per second during a rolling time window of 500 milliseconds in the case of a power park module. ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Fast fault-current gain k and timing Fault-current injection Additional reactive current injection proportional to voltage deviation with gain k adjustable 2 ≤ k ≤ 6 (adjustment step ≤0,5 pu); default k = 2 for systems with nominal voltage below 66 kV and k = 5 for systems of 66 kV and higher; rise time to 90% of final value ≤30 ms and settling time (within 90–110%) ≤60 ms from fault inception Fast fault current for power park modules under RfG Art 20(2)(b) (Artikel 3.17, tiende t/m vijftiende lid). Binds storage 1–50 MW via Artikel 2.9(3)(a): non-synchronously coupled storage complies with the PPM articles (under 2°) and storage ≥1 MW with type B provisions (under 4°). The prescribed-current mode quoted here applies to PPMs connected to a distribution system and to transmission-connected PPMs that apply the mode of the elfde lid, onderdeel b; transmission-connected PPMs may instead operate the voltage-opposing mode without prescribed current (elfde lid, onderdeel a), the mode(s) being agreed and laid down in the aansluit- en transportovereenkomst (dertiende lid). Activation criteria are measured at the terminals (aansluitklemmen) of the individual generating units: voltage deviation >10% of nominal RMS, or a step change ≥5% of peak nominal voltage; delivery is at the transfer point of the connection (tiende lid). Asymmetrical faults: veertiende lid applies the requirements to the positive and negative sequence components, with k2 adjustable 2 ≤ k2 ≤ 6 and default k2 = k — negative-sequence injection is explicitly addressed. Artikel 3.17, twaalfde lid, onderdelen f, g en h, Systeemcode elektriciteit 2026, geldend van 09-07-2026 + Artikel 3.17, twaalfde lid, onderdeel c, Systeemcode elektriciteit 2026, geldend van 09-07-2026
The clauses this row cites

Artikel 3.17, twaalfde lid, onderdelen f, g en h, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ f. het aanpassingsbereik van k is: 2 ≤ k ≤ 6; g. de aanpassingsstap van k is kleiner dan of gelijk aan 0,5 pu; h. de standaardwaarde van k is 2 voor een power park module aangesloten op een systeem met een nominale spanning lager dan 66 kV en de standaardwaarde van k is 5 voor een power park module aangesloten op een systeem met een nominale spanning van 66 kV en hoger; indien een andere waarde dan de standaardwaarde wordt overeengekomen, wordt deze vastgelegd in de aansluit- en transportovereenkomst; ” Translation: “ f. the adjustment range of k is: 2 ≤ k ≤ 6; g. the adjustment step of k is smaller than or equal to 0,5 pu; h. the default value of k is 2 for a power park module connected to a system with a nominal voltage lower than 66 kV and the default value of k is 5 for a power park module connected to a system with a nominal voltage of 66 kV and higher; if a value other than the default value is agreed, this is laid down in the connection and transport agreement; ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Artikel 3.17, twaalfde lid, onderdeel c, Systeemcode elektriciteit 2026, geldend van 09-07-2026 — “ c. de stijgtijd (de tijd vanaf de storingsaanvang die ervoor nodig is dat de te injecteren additionele blindstroom voor het eerst een waarde van 90% van de stabiele eindwaarde bereikt) is maximaal 30 ms; de inslingertijd (de tijd vanaf de storingsaanvang die ervoor nodig is dat de te injecteren additionele blindstroom blijvend tussen 90% en 110% van de stabiele eindwaarde is) is maximaal 60 ms; ” Translation: “ c. the rise time (the time from the fault inception that is needed for the additional reactive current to be injected to reach for the first time a value of 90% of the stable final value) is at most 30 ms; the settling time (the time from the fault inception that is needed for the additional reactive current to be injected to remain between 90% and 110% of the stable final value) is at most 60 ms; ” (Systeemcode elektriciteit 2026 (BWBR0052336), geconsolideerde tekst geldend van 09-07-2026 t/m heden, accessed 2026-08-09)

Scope

Who does Netherlands (TenneT) bind, and since when?

Type D power park modules (RfG art. 16), ≥110 kV. No date of effect is published here — grid codes are reissued, so check the current issue before relying on it.

These figures are a reading aid, not legal advice. Grid codes are reissued: verify against the current edition before you design to them.

Curve data last checked against the code on — 66 standards, 130 envelopes, published by bess.engineer under CC BY 4.0.

Questions

Questions this page answers about Netherlands (TenneT)

Does Netherlands (TenneT) require ride-through, or only that the plant does not trip?
Ride-through. Every envelope on this page is a performance duty the plant must meet, not a protection-setting no-trip boundary — they are different obligations. That is what these curves are; they are not everything Netherlands (TenneT) contains. The requirement sentence under each chart says which side of the curve is the compliant one.
Are the numbers on this page taken from Netherlands (TenneT) itself?
Yes. Every breakpoint is read from the code, and each envelope carries the clause it came from, quoted in full under its chart — so you can check the figure against the standard rather than cite it from this page.
Which events are charted for Netherlands (TenneT)?
Netherlands (TenneT) is charted here with 1 envelope — low-voltage ride-through (LVRT). No high-voltage or frequency envelope is charted here — check Netherlands (TenneT) itself before concluding it sets none.
Related

Ride-through, in context.

An envelope is a compliance boundary; understanding why it exists is a different question. The ride-through and grid-forming entries cover the engineering, and the Engineering Foundations course builds it from the physics up.