NERC PRC-029-1 (IBR) ride-through requirements
Low-voltage ride-through, High-voltage ride-through, Frequency ride-through for the United States. Every breakpoint below is read from the code itself, and carries the clause it came from — so you can check it, not just cite it.
What is the low-voltage ride-through envelope for NERC PRC-029-1 (IBR)?
The plant must ride through for any voltage that stays on or above this envelope. The envelope holds 0 pu from t = 0 to 320 ms; then 0.25 pu from 320 ms to 1.2 s; then 0.5 pu from 1.2 s to 3 s; then 0.7 pu from 3 s to 6 s; then 0.9 pu from 6 s onward — the last band the envelope defines, with no stated end time.
Every breakpoint is stated in the clause cited below.
Applies to BES inverter-based resources; valid for RoCoF ≤ 5 Hz/s
| From | To | Voltage | Between the points |
|---|---|---|---|
| 0 | 320 ms | 0 pu | Held flat |
| 320 ms | 1.2 s | 0.25 pu | Held flat |
| 1.2 s | 3 s | 0.5 pu | Held flat |
| 3 s | 6 s | 0.7 pu | Held flat |
| 6 s | no stated end | 0.9 pu | Held flat |
The clause this came from
NERC PRC-029-1, Attachment 1 'Voltage Ride-Through Criteria', Table 2 'Voltage Ride-through Requirements for All Other IBR' (p.12), with Boundary Details bullets 2(b) (PV+BESS → Table 2), 7 and 11 (p.13).
What is the high-voltage ride-through envelope for NERC PRC-029-1 (IBR)?
The plant must ride through for any voltage that stays on or below this envelope. The envelope holds 1.2 pu from t = 0 to 1 s; then 1.1 pu from 1 s to 30 min; then 1.05 pu from 30 min onward — the last band the envelope defines, with no stated end time.
The last band has no stated end time. The clause below states a continuous region — highlighted.
Applies to BES inverter-based resources; valid for RoCoF ≤ 5 Hz/s
| From | To | Voltage | Between the points |
|---|---|---|---|
| 0 | 1 s | 1.2 pu | Held flat |
| 1 s | 30 min | 1.1 pu | Held flat |
| 30 min | no stated end | 1.05 pu | Held flat |
The clause this came from
NERC PRC-029-1, Attachment 1, Table 2 'Voltage Ride-through Requirements for All Other IBR' (p.12), rows '>1.20 N/A', '>1.10 Mandatory Operation Region 1.0', '>1.05 Continuous Operation Region 1800'.
What is the frequency ride-through envelope for NERC PRC-029-1 (IBR)?
The plant must ride through between the upper and lower bands. The upper (over-frequency) band holds 61.8 Hz from t = 0 to 299 s; then 61.2 Hz from 299 s onward — the last band the envelope defines, with no stated end time. The lower (under-frequency) band holds 57 Hz from t = 0 to 299 s; then 58.8 Hz from 299 s onward — the last band the envelope defines, with no stated end time.
Every breakpoint is stated in the clause cited below.
Applies to BES inverter-based resources; valid for RoCoF ≤ 5 Hz/s
Upper limit
| From | To | Frequency | Between the points |
|---|---|---|---|
| 0 | 299 s | 61.8 Hz | Held flat |
| 299 s | no stated end | 61.2 Hz | Held flat |
Lower limit
| From | To | Frequency | Between the points |
|---|---|---|---|
| 0 | 299 s | 57 Hz | Held flat |
| 299 s | no stated end | 58.8 Hz | Held flat |
The clause this came from
NERC PRC-029-1, Attachment 2 'Frequency Ride-Through Criteria', Table 3 'Frequency Ride-through Capability Requirements' and Figure 1 'PRC-029 Frequency Ride-through Requirements' (p.14); Requirement R3 caps applicability at RoCoF ≤ 5 Hz/s.
Who does NERC PRC-029-1 (IBR) bind, and since when?
BES inverter-based resources; valid for RoCoF ≤ 5 Hz/s. Enforceable from 1 Oct 2026 (FERC Order No. 909).
These figures are a reading aid, not legal advice. Grid codes are reissued: verify against the current edition before you design to them.
Digitised operating parameters beyond ride-through — droop, reactive capability, operating ranges — are published for 36 of the 66 codes in this atlas, not yet for NERC PRC-029-1 (IBR). That is a gap on this site, not a statement that NERC PRC-029-1 (IBR) sets none — the atlas hub marks the codes that carry them.
Curve data last checked against the code on — 66 standards, 130 envelopes, published by bess.engineer under CC BY 4.0.
Questions this page answers about NERC PRC-029-1 (IBR)
- Does NERC PRC-029-1 (IBR) require ride-through, or only that the plant does not trip?
- Ride-through. Every envelope on this page is a performance duty the plant must meet, not a protection-setting no-trip boundary — they are different obligations. That is what these curves are; they are not everything NERC PRC-029-1 (IBR) contains. The requirement sentence under each chart says which side of the curve is the compliant one.
- Are the numbers on this page taken from NERC PRC-029-1 (IBR) itself?
- Yes. Every breakpoint is read from the code, and each envelope carries the clause it came from, quoted in full under its chart — so you can check the figure against the standard rather than cite it from this page.
- Which events are charted for NERC PRC-029-1 (IBR)?
- NERC PRC-029-1 (IBR) is charted here with 3 envelopes — low-voltage ride-through, high-voltage ride-through, frequency ride-through (LVRT, HVRT, FRT).
Ride-through, in context.
An envelope is a compliance boundary; understanding why it exists is a different question. The ride-through and grid-forming entries cover the engineering, and the Engineering Foundations course builds it from the physics up.
Also for the United States: NERC PRC-024-4 (Western), ERCOT (NOG 2.6.2.1), ERCOT (NOG 2.9.1.2 legacy), ERCOT (NOG 2.9.1), IEEE 1547-2018 Cat III, IEEE 2800-2022, and 5 more