Why a 100 MWh Battery Delivers Less to the Grid
Chapters
- Play from 0:00 , 100 MWh: how much reaches the grid?
- Play from 0:21 , Usable SOC: retained energy is not a loss
- Play from 0:42 , Cell discharge losses
- Play from 0:56 , DC cable losses and PCS conversion
- Play from 1:16 , MV transformer and AC cable losses
- Play from 1:35 , HV transformer losses
- Play from 1:47 , Auxiliary loads and net export
- Play from 2:10 , Where the 11.03 MWh went
- Play from 2:28 , Compare energy at the same measurement boundary
About this episode
A battery starts with 100 MWh. In this worked example, 88.97 MWh reaches the grid meter. Follow the energy from the cells to the meter and see why 5 MWh held in reserve is different from the 6.03 MWh consumed by auxiliary loads or lost along the electrical path.
In Episode 8 of BESS Decoded, see how the usable state-of-charge (SOC) window, cell discharge losses, DC cables, power conversion system (PCS), AC cables, transformers and auxiliary loads such as cooling affect net energy export.
THE 100 MWh EXAMPLE
- 5 MWh stays in the battery outside the usable SOC window.
- 6.03 MWh goes to electrical and conversion losses and auxiliary consumption.
- 88.97 MWh reaches the grid meter as net exported energy.
The example covers one discharge. Round-trip efficiency also includes charging. When comparing a BESS specification or supplier quote, check where the energy is measured and which losses the quoted figure already includes.
Terms in this episode
-
The MWh a plant can physically deliver at a stated boundary under the conditions in force — usable DC energy net of conversion, collection and auxiliary losses. Capability, not the contracted guarantee.
-
Where in the power path a power, energy, or efficiency figure is defined — cell, DC bus, PCS terminals, or POI. Numbers quoted at different boundaries cannot be compared.
-
The rated capacity at the start of life. Usable and contract energy are always lower.
-
The DC-side energy the SOC window lets the plant cycle — always less than nameplate, and before the losses on the way to the meter.
-
The permitted band of state of charge the BMS lets the system operate across. Its width — not nameplate — sets usable energy.
-
Energy out divided by energy in over a full cycle, after all losses. The boundary matters — gross vs. net.
-
Resistive heating in any current path — dissipated power is current squared times resistance, so twice the current makes four times the heat. The scaling law behind high-voltage design, cable loss budgets and the rate-dependent share of round-trip losses.
-
On-site power drawn by HVAC, controls, and the BMS. It reduces net round-trip efficiency and usable output.
Go deeper
Build your knowledge with structured courses and practical learning resources.
Grid-Scale Battery Energy Storage (BESS): Complete Guide
The complete foundation — from cell chemistry to grid revenue. Batteries, enclosures, PCS, controls, safety, project finance, and how BESS actually makes money.
Learn it in the Grid-Scale BESS course