What a battery can sell
What ancillary services can a battery sell in New Zealand Electricity Market (NZEM)?
New Zealand Electricity Market (NZEM) has 6 ancillary-service products, across 4 families — operating reserve, reactive power & voltage, black start & restoration and other services: Black Start, Fast Instantaneous Reserve, Frequency Keeping, Over-Frequency Reserve, Sustained Instantaneous Reserve, Voltage Support. Response timing, direction and eligibility for each are in the cards below, as the official sources state them.
Facts below are stated as the official sources state them. A missing line means the
source does not state that value — never that the value is zero.
Operating reserve
-
Fast Instantaneous Reserve FIR
operational
Arrest frequency decline after the largest credible generating or transmission contingent event and prevent frequency falling below the security limit.
- Direction
- raise generation; interrupt load
- Full activation
- 6 s
- Sustain
- at least 60 s
- Trigger / range
- Contingent event; interruptible load is expected to respond within one second after frequency reaches 49.2 Hz.
- Eligibility
- Technically approved partly-loaded or tail-water-depressed generation, storage where compliant, and interruptible load.
- Typical procurement
- Procured quantity is driven by the largest credible contingent event and transfer constraints for each trading period.
-
Over-Frequency Reserve OFR
operational
Automatically reduce generation following a frequency rise, including an HVDC-related contingent event.
- Direction
- lower generation
- Trigger / range
- Contracted over-frequency relay setting; no single national threshold is stated in the procurement-plan overview.
- Eligibility
- Generation capable of automatic disconnection or reduction and meeting contract tests.
- Typical procurement
- System Operator net purchase assessment; stable typical MW not published in the cited plan.
-
Sustained Instantaneous Reserve SIR
operational
Restore and stabilise frequency after a contingent event long enough for redispatch.
- Direction
- raise generation; interrupt load
- Full activation
- 60 s
- Sustain
- at least 15 min
- Trigger / range
- Contingent event; interruptible load frequency relay settings are contract/Code specific.
- Eligibility
- Technically approved generation, storage where compliant and interruptible load.
- Typical procurement
- Based on the largest credible contingent event for each island/trading period.
Black start & restoration
Other services
-
Frequency Keeping FK
operational
Manage short-term supply-demand imbalance and keep frequency at or near 50 Hz.
- Direction
- raise; lower
- Sustain
- at least 30 min
- Trigger / range
- System Operator regulating instructions; no single fixed frequency trigger.
- Eligibility
- Technically reviewed generators or other eligible resources with an ancillary-service procurement contract.
- Typical procurement
- Net purchase quantity is assessed separately for each island and trading period.
The current official overview describes quick variation in response to instructions but does not publish one universal full-activation time. Providers must maintain capability for the 30-minute trading period.