Greece electricity market

Greece. Status: operational; no replacement-reserve product and no active adequacy Capacity Market.

Wholesale design: EU-coupled zonal energy market; IPTO co-optimizes balancing-capacity and balancing-energy products in 15-minute periods.

Market type
Jurisdictional market
Operators
IPTO/ADMIE · HEnEx
Dispatch model
centralized unit-based integrated scheduling and real-time dispatch
Where energy trades

Where does energy trade in Greece electricity market?

Energy in Greece electricity market trades in 5 layers: day-ahead, intraday, integrated scheduling, balancing capacity and balancing energy.

What a battery can sell

What ancillary services can a battery sell in Greece electricity market?

Greece electricity market has 3 ancillary-service products, across 3 families — frequency containment, automatic frequency restoration and manual frequency restoration: automatic Frequency Restoration Reserve, Frequency Containment Reserve, manual Frequency Restoration Reserve. Response timing, direction and eligibility for each are in the table below; a product's full record lists the official sources behind it.

Every value below comes from the official sources listed in that product's full record. Most products cite more than one, and the published sources do not say which of them states each individual value, so the binding is to the product's record rather than to a single document. A missing line means the source does not state that value — never that the value is zero.

Scroll the table sideways for the rest of the columns →

3 ancillary-service products in Greece electricity market, grouped into 3 families. Each row runs left to right through one product's life: how it activates, how quickly it has to respond, how long it has to keep delivering, and how it is bought.
Service How it activates Response Sustained delivery Procurement
Frequency containment
Frequency Containment Reserve FCRprimary frequency controlprimary reserve symmetric or separate upward/downward according to synchronous area and national procurement operational Response type automatic, local-frequency-proportional, pre-fault and post-fault containment Trigger continuous response to local frequency deviation; exact deadband and droop are national/synchronous-area technical parameters Full activation 30 s Bought national or regional capacity procurement, commonly day-ahead How it settles capacity remuneration or mandatory provision depending on national implementation; energy/imbalance treatment is national Pricing design national/regional rules Counted as national or regional procurement, which the operator does not publish as a figure
Full record for Frequency Containment Reserve — page or table locator recorded
What it is for

Contain frequency deviations before frequency-restoration processes take over.

Where it sits

national FCR implementation

Where it applies

Bidding zone: GR

Published checkpoints

Full activation requirement: 30 s · Response checkpoint: 15 s (50% of response) · Response checkpoint: 30 s (100% of response)

Who can provide it

prequalified generation, storage or demand resources meeting synchronous-area and national TSO requirements

Notes from the source

Thirty seconds is the Continental Europe full-activation time, not a universal Europe-wide value.

Continental Europe requirement for a frequency deviation of at least 200 mHz; do not apply to Nordic FCR products

Status of this product

Operational in 2025

Checkpoint recap

Full activation 30 s

What the source does not state

The source states the full-activation requirement. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Automatic frequency restoration
automatic Frequency Restoration Reserve aFRRsecondary controlsecondary reserve separate upward and downward operational in participating markets; rollout continued Response type automatic central activation, normally via AGC/set-point signal; continuously activatable standard product Trigger activated from TSO control-area needs rather than a single public frequency threshold Full activation 5 min Bought balancing capacity remains nationally procured; balancing energy is activated through national systems and PICASSO where connected How it settles separate capacity and activated-energy settlement where capacity is procured; imbalance effects remain under national terms Smallest bid 1 MW Pricing design capacity pricing is national; common merit-order activation and marginal pricing apply through PICASSO subject to implementation rules Counted as national capacity procurement
Full record for automatic Frequency Restoration Reserve — page or table locator recorded
What it is for

Restore frequency and area-control error and release FCR after an imbalance.

Where it sits

national aFRR implementation

Where it applies

Bidding zone: GR

Bought in blocks of

15 min

Published checkpoints

Standard product, full activation: 5 min

How this market implements it

IPTO co-optimized balancing capacity and energy in 15-minute periods; automatic commands are issued every four seconds.

Who can provide it

prequalified balancing service providers; aggregation rules are national

Notes from the source

A common balancing-energy product does not imply common national capacity procurement, qualification or settlement.

EU standard-product full activation time; before 18 December 2025 national products and transition rules still apply and have to be checked market by market

Status of this product

Operational in 2025

Checkpoint recap

Full activation 5 min

What the source does not state

The source states the full-activation requirement. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Manual frequency restoration
manual Frequency Restoration Reserve mFRRtertiary reservemanual restoration reserve separate upward and downward operational in national markets; MARI integration continued Response type scheduled or direct manual/automated-dispatch activation of a balancing-energy bid Trigger TSO activation based on imbalance, reserve need and common merit order; not a single frequency threshold Full activation 750 s maximum full activation time for the EU standard product; legacy national products may differ Minimum obligation at least 5 min Bought national balancing-capacity procurement; balancing-energy activation through national arrangements and MARI where connected How it settles capacity plus activated energy where capacity is procured; energy-only bids may also participate under national terms Smallest bid 1 MW Pricing design national capacity rules and common-platform energy pricing under the implementation framework Counted as national capacity procurement
Full record for manual Frequency Restoration Reserve — page or table locator recorded
What it is for

Restore system balance manually or by automated dispatch after faster reserves and release aFRR/FCR.

Where it sits

national mFRR implementation

Where it applies

Bidding zone: GR

Bought in blocks of

15 min

Published checkpoints

Standard product, maximum full activation: 750 s

Who can provide it

prequalified balancing service providers; aggregation and telemetry requirements are national

Notes from the source

The 12.5-minute value is a standard-product maximum full-activation time; legacy national tertiary products may use different labels or timings.

Status of this product

Operational in 2025

Checkpoint recap

Full activation 750 s · Minimum sustained 5 min

What the source does not state

The source states the full-activation requirement and a minimum delivery period. It does not state a maximum duration, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Getting paid to exist

Does Greece electricity market have a capacity mechanism?

No. Greece electricity market's capacity/adequacy arrangement: No operational Greek adequacy Capacity Market.

No operational Greek adequacy Capacity Market

no active market-wide capacity auction identified for 2025

Auction held in 2025
No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.

IPTO balancing-capacity procurement is short-term balancing, not a forward adequacy mechanism.

Revenue routes

Merchant revenue routes

  • energy
  • FCR
  • aFRR
  • mFRR
Where this comes from

Official sources

Market explainer

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0, rendered here with wording edited for readability). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Questions

Common questions about Greece electricity market

Who operates Greece electricity market?
Greece electricity market covers Greece and is operated by IPTO/ADMIE and HEnEx.
Was a qualifying capacity event held in Greece electricity market in 2025?
No. No operational Greek adequacy Capacity Market: no qualifying 2025 event is recorded. No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
How is energy traded, priced and settled in Greece electricity market?
Greece electricity market: EU-coupled zonal energy market; IPTO co-optimizes balancing-capacity and balancing-energy products in 15-minute periods. Dispatch — centralized unit-based integrated scheduling and real-time dispatch.
Keep exploring

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.

All electricity markets