Denmark electricity market

Denmark. Status: operational.

Wholesale design: Two bidding zones with different frequency-product families by synchronous area; aFRR and mFRR are procured under Energinet tender conditions.

Market type
Jurisdictional market
Operators
Energinet · Nord Pool · EPEX SPOT
Dispatch model
self-dispatch; DK1 belongs to Continental Europe and DK2 to the Nordic synchronous area
Where energy trades

Where does energy trade in Denmark electricity market?

Energy in Denmark electricity market trades in 2 layers: Nordic energy market and balancing.

What a battery can sell

What ancillary services can a battery sell in Denmark electricity market?

Denmark electricity market has 9 ancillary-service products, across 4 families — frequency containment, automatic frequency restoration, manual frequency restoration and inertia & system strength: automatic Frequency Restoration Reserve; Frequency Containment Reserve; manual Frequency Restoration Reserve; Nordic automatic Frequency Restoration Reserve; Frequency Containment Reserve for Disturbances, downward; Frequency Containment Reserve for Disturbances, upward; Frequency Containment Reserve for Normal operation; Fast Frequency Reserve, and 1 more. Response timing, direction and eligibility for each are in the table below; a product's full record lists the official sources behind it.

Every value below comes from the official sources listed in that product's full record. Most products cite more than one, and the published sources do not say which of them states each individual value, so the binding is to the product's record rather than to a single document. A missing line means the source does not state that value — never that the value is zero.

Scroll the table sideways for the rest of the columns →

9 ancillary-service products in Denmark electricity market, grouped into 4 families. Each row runs left to right through one product's life: how it activates, how quickly it has to respond, how long it has to keep delivering, and how it is bought.
Service How it activates Response Sustained delivery Procurement
Frequency containment
Frequency Containment Reserve FCRprimary frequency controlprimary reserve symmetric or separate upward/downward according to synchronous area and national procurement operational Response type automatic, local-frequency-proportional, pre-fault and post-fault containment Trigger continuous response to local frequency deviation; exact deadband and droop are national/synchronous-area technical parameters Full activation 30 s Bought national or regional capacity procurement, commonly day-ahead How it settles capacity remuneration or mandatory provision depending on national implementation; energy/imbalance treatment is national Pricing design national/regional rules Counted as DK1 only, not DK2
Full record for Frequency Containment Reserve — page or table locator recorded
What it is for

Contain frequency deviations before frequency-restoration processes take over.

Where it sits

Continental Europe FCR capacity procurement

Where it applies

Bidding zone: DK1

Published checkpoints

Full activation requirement: 30 s · Response checkpoint: 15 s (50% of response) · Response checkpoint: 30 s (100% of response)

How this market implements it

This record applies to DK1; DK2 uses Nordic FCR-N/FCR-D products.

Who can provide it

prequalified generation, storage or demand resources meeting synchronous-area and national TSO requirements

Notes from the source

Thirty seconds is the Continental Europe full-activation time, not a universal Europe-wide value.

Continental Europe requirement for a frequency deviation of at least 200 mHz; do not apply to Nordic FCR products

Status of this product

Operational in 2025

Checkpoint recap

Full activation 30 s

What the source does not state

The source states the full-activation requirement. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Frequency Containment Reserve for Disturbances, downward FCR-D down downward operational Response type automatic post-fault frequency response Trigger over-frequency disturbance response curve Response checkpoint 7.5 s (86% of response) Minimum obligation at least 20 min System requirement — approximate 1400 MW Bought national day-ahead and/or longer-term markets How it settles capacity payment under national arrangements Pricing design national rules Counted as the Nordic total, not the DK2 allocation
Full record for Frequency Containment Reserve for Disturbances, downward — page or table locator recorded
What it is for

Contain over-frequency after a major disturbance.

Where it sits

Danish-Swedish procurement of Nordic FCR-D down

Where it applies

Bidding zone: DK2

Published checkpoints

Response checkpoint: 7.5 s (86% of response)

Who can provide it

Nordic prequalification and national BSP registration

Notes from the source

The 7.5-second checkpoint is a measurement point, not the point of full activation.

Status of this product

Operational in 2025

Checkpoint recap

Minimum sustained 20 min

What the source does not state

The source states a minimum delivery period and a procurement volume. It does not state a response deadline of its own or a maximum duration. It does publish a response checkpoint, listed with the other checkpoints in this record.

Sources
Frequency Containment Reserve for Disturbances, upward FCR-D up upward operational Response type automatic post-fault frequency response Trigger under-frequency disturbance response curve Response checkpoint 7.5 s (86% of response) Minimum obligation at least 20 min System requirement — approximate 1450 MW Bought national day-ahead and/or longer-term markets How it settles capacity payment under national arrangements Pricing design national rules Counted as the Nordic total, not the DK2 allocation
Full record for Frequency Containment Reserve for Disturbances, upward — page or table locator recorded
What it is for

Contain under-frequency after a major disturbance.

Where it sits

Danish-Swedish procurement of Nordic FCR-D up

Where it applies

Bidding zone: DK2

Published checkpoints

Response checkpoint: 7.5 s (86% of response)

Who can provide it

Nordic prequalification and national BSP registration

Notes from the source

The 7.5-second checkpoint is a measurement point, not the point of full activation.

Status of this product

Operational in 2025

Checkpoint recap

Minimum sustained 20 min

What the source does not state

The source states a minimum delivery period and a procurement volume. It does not state a response deadline of its own or a maximum duration. It does publish a response checkpoint, listed with the other checkpoints in this record.

Sources
Frequency Containment Reserve for Normal operation FCR-N symmetric up and down operational Response type automatic proportional pre-fault frequency response Trigger 49.9-50.1 Hz normal-operation band Response checkpoint 60 s (63% of response) System requirement 600 MW Bought national day-ahead and/or longer-term markets How it settles capacity payment; energy and imbalance treatment varies nationally Pricing design national pay-as-bid or marginal arrangements Counted as the Nordic total, not the DK2 allocation
Full record for Frequency Containment Reserve for Normal operation — page or table locator recorded
What it is for

Continuously regulate small Nordic frequency deviations in normal operation.

Where it sits

Danish-Swedish procurement of Nordic FCR-N

Where it applies

Bidding zone: DK2

Published checkpoints

Response checkpoint: 60 s (63% of response) · Response checkpoint: 3 min (95% of response)

Who can provide it

Nordic prequalification and national BSP registration

Notes from the source

Total need is a Nordic dimensioning value, not each country's awarded volume.

Status of this product

Operational in 2025

What the source does not state

The source states a procurement volume. It does not state a response deadline of its own or how long delivery has to be sustained. It does publish a response checkpoint, listed with the other checkpoints in this record.

Sources
Automatic frequency restoration
automatic Frequency Restoration Reserve aFRRsecondary controlsecondary reserve separate upward and downward operational in participating markets; rollout continued Response type automatic central activation, normally via AGC/set-point signal; continuously activatable standard product Trigger activated from TSO control-area needs rather than a single public frequency threshold Full activation 5 min Bought balancing capacity remains nationally procured; balancing energy is activated through national systems and PICASSO where connected How it settles separate capacity and activated-energy settlement where capacity is procured; imbalance effects remain under national terms Smallest bid 1 MW Pricing design capacity pricing is national; common merit-order activation and marginal pricing apply through PICASSO subject to implementation rules Counted as national or Nordic capacity procurement, not an EU total
Full record for automatic Frequency Restoration Reserve — page or table locator recorded
What it is for

Restore frequency and area-control error and release FCR after an imbalance.

Where it sits

EU balancing-energy standard/PICASSO parent layer; capacity procurement differs by zone

Where it applies

Bidding zones: DK1, DK2

Bought in blocks of

15 min

Published checkpoints

Standard product, full activation: 5 min

Who can provide it

prequalified balancing service providers; aggregation rules are national

Notes from the source

A common balancing-energy product does not imply common national capacity procurement, qualification or settlement.

EU standard-product full activation time; before 18 December 2025 national products and transition rules still apply and have to be checked market by market

Status of this product

Operational in 2025

Checkpoint recap

Full activation 5 min

What the source does not state

The source states the full-activation requirement. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Nordic automatic Frequency Restoration Reserve aFRR separate upward and downward operational Response type automatic AGC/set-point response Trigger TSO activation signal Full activation 5 min System requirement — approximate 250 MW Bought national procurement coordinated in the Nordic market How it settles capacity and activated energy Pricing design national/common market rules by product and period Counted as a dynamic Nordic total, not the DK2 award
Full record for Nordic automatic Frequency Restoration Reserve — page or table locator recorded
What it is for

Automatically restore Nordic frequency and balance after FCR action.

Where it sits

common Nordic aFRR capacity procurement; EU/PICASSO energy layer is automatic Frequency Restoration Reserve

Where it applies

Bidding zone: DK2

Published checkpoints

Regional implementation, full activation: 5 min

Who can provide it

prequalified BSPs

Notes from the source

The Nordic requirement is dynamic and should not be treated as a fixed annual procurement.

Status of this product

Operational in 2025 in DK2 only, for the Nordic capacity market

Checkpoint recap

Full activation 5 min

What the source does not state

The source states the full-activation requirement and a procurement volume. It does not state how long delivery has to be sustained.

Sources
Manual frequency restoration
manual Frequency Restoration Reserve mFRRtertiary reservemanual restoration reserve separate upward and downward operational in national markets; MARI integration continued Response type scheduled or direct manual/automated-dispatch activation of a balancing-energy bid Trigger TSO activation based on imbalance, reserve need and common merit order; not a single frequency threshold Full activation 750 s maximum full activation time for the EU standard product; legacy national products may differ Minimum obligation at least 5 min Bought national balancing-capacity procurement; balancing-energy activation through national arrangements and MARI where connected How it settles capacity plus activated energy where capacity is procured; energy-only bids may also participate under national terms Smallest bid 1 MW Pricing design national capacity rules and common-platform energy pricing under the implementation framework Counted as national or Nordic capacity procurement, not an EU total
Full record for manual Frequency Restoration Reserve — page or table locator recorded
What it is for

Restore system balance manually or by automated dispatch after faster reserves and release aFRR/FCR.

Where it sits

EU standard-product parent layer; Nordic mFRR is the 2025 regional implementation

Where it applies

Bidding zones: DK1, DK2

Bought in blocks of

15 min

Published checkpoints

Standard product, maximum full activation: 750 s

Who can provide it

prequalified balancing service providers; aggregation and telemetry requirements are national

Notes from the source

The 12.5-minute value is a standard-product maximum full-activation time; legacy national tertiary products may use different labels or timings.

Status of this product

Operational nationally and across the Nordics in 2025, but not as the MARI product

Checkpoint recap

Full activation 750 s · Minimum sustained 5 min

What the source does not state

The source states the full-activation requirement and a minimum delivery period. It does not state a maximum duration, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Nordic manual Frequency Restoration Reserve mFRRregulating power separate upward and downward operational; automated Nordic mFRR energy-activation market launched 4 March 2025 Response type manual or automated dispatch of scheduled/direct activation bids Trigger TSO balancing-energy activation Full activation 750 s Bought national capacity procurement and common Nordic energy-activation market How it settles capacity where procured plus activated energy Pricing design capacity rules national; energy merit-order activation Counted as dynamic DK1 and DK2 procurement, not an EU total
Full record for Nordic manual Frequency Restoration Reserve — page or table locator recorded
What it is for

Restore balance and release faster reserves using manual or automated TSO dispatch.

Where it sits

Nordic mFRR energy activation and trilateral capacity procurement; EU/MARI parent is manual Frequency Restoration Reserve

Where it applies

Bidding zones: DK1, DK2

Published checkpoints

Regional implementation, maximum full activation: 750 s

Who can provide it

prequalified BSPs

Notes from the source

Norway also procures a national disturbance variant (mFRR-D); this record describes the common product family.

Status of this product

Operational from 4 March 2025, but not as the MARI product

Checkpoint recap

Full activation 750 s

What the source does not state

The source states the full-activation requirement. It does not state how long delivery has to be sustained, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Inertia & system strength
Fast Frequency Reserve FFRFFR ProfileFFR Flex upward operational when needed Response type automatic post-fault frequency-triggered response Trigger procured only when forecast Nordic inertia makes it necessary; activation threshold/profile depends on product variant Representative value 1 s Maximum stated 5 s to 30 s Bought national TSO tenders when the Nordic need is forecast How it settles availability under national procurement and performance rules Pricing design national tender rules Counted as a dynamic DK2-only need
Full record for Fast Frequency Reserve — page or table locator recorded
What it is for

Arrest rapid frequency decline in low-inertia Nordic operating conditions before FCR-D fully responds.

Where it sits

local DK2 procurement of Nordic FFR

Where it applies

Bidding zone: DK2

Who can provide it

prequalified fast storage, demand, generation or other resources

Notes from the source

FFR variants have different frequency thresholds and activation times; use national tender conditions for bidding.

This is a representative value for the product family. The exact activation requirement depends on the contracted threshold and profile, so treat it as indicative rather than as one universal deadline

Status of this product

Operational when needed in 2025

Checkpoint recap

Minimum sustained 5 s · Maximum sustained 30 s

What the source does not state

The source states a maximum delivery duration. It does not state a response time, and the volume is either set per auction or not published as a standing figure — the source does not say which.

Sources
Getting paid to exist

Does Denmark electricity market have a capacity mechanism?

No. Denmark electricity market's capacity/adequacy arrangement: No Danish market-wide adequacy Capacity Market.

No Danish market-wide adequacy Capacity Market

no operational market-wide Capacity Market or strategic reserve identified in ACER's 2025 EU mapping

Auction held in 2025
No — No capacity auction for this market was found to have been held during 2025 in the sources reviewed.

Energinet ancillary-service tenders are operational reserve markets.

Revenue routes

Merchant revenue routes

  • energy
  • FCR family
  • aFRR
  • mFRR
Where this comes from

Official sources

Current as of · from the Global Electricity Market Catalogue v1.2.0 (compiled to , CC BY 4.0, rendered here with wording edited for readability). Facts belong to the linked official authorities; verify the current rules before design or bidding decisions.

Questions

Common questions about Denmark electricity market

Who operates Denmark electricity market?
Denmark electricity market covers Denmark and is operated by Energinet, Nord Pool and EPEX SPOT.
Was a qualifying capacity event held in Denmark electricity market in 2025?
No. No Danish market-wide adequacy Capacity Market: no qualifying 2025 event is recorded. No capacity auction for this market was found to have been held during 2025 in the sources reviewed.
How is energy traded, priced and settled in Denmark electricity market?
Denmark electricity market: Two bidding zones with different frequency-product families by synchronous area; aFRR and mFRR are procured under Energinet tender conditions. Dispatch — self-dispatch; DK1 belongs to Continental Europe and DK2 to the Nordic synchronous area.
Keep exploring

Every market, one map.

The markets index holds the full set. For what the grid demands of a battery here, see the grid-code ride-through atlas.

All electricity markets